1 |
Supplying & stacking of garden soil at various campuses of VECC, 1/AF, Bidhannagar, Kolkata-64
(807.58 KB)
|
VECC/MEG/ESD/P&G/PW/2025-26/188/878 Date: 01.05.2025
|
01-05-2025 |
09-05-2025 |
|
2 |
Supply, fabrication and Installation of coalescer Oil Filter in the Air Line
(568.55 KB)
|
VECC/MEG/CPIS/NIT/PETTY WORKS/B-19/806 Dated: 15/04/2025
|
15-04-2025 |
24-04-2025 |
|
3 |
Shifting of 2 Nos. of Helium Gas Quads (Each 4.5 Tones) and all the other materials stored for Helium Plant’s use (Approx. total weight 8 Tones) from Helium Gas Manifold yard to is outside adjacent open space towards Buffer Tank and reinstal
(700.27 KB)
|
VECC/MEG/CPIS/NIT/PETTY WORKS/ B-18/805 Dated: 15/04/2025
|
15-04-2025 |
24-04-2025 |
|
4 |
X-ray Radiography testing for 25 weld joints of the new helium cold box
(708.75 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/B-17/755 Dated: 07/04/2025
|
08-04-2025 |
16-04-2025 |
|
5 |
Supply and installation of NO Drone Zone sign Board at VECC, Kolkata.
(999.57 KB)
|
VECC/C&IG/NDZ/NIT/2025/746, Dated- 07/04/2025
|
08-04-2025 |
22-04-2025 |
|
6 |
Shifting of Electrical Panels and electrical cables inside VECC, Kolkata.
(575.42 KB)
|
VECC/MEG/ESD/ES/2025-26/735 Date:03/04/2025
|
04-04-2025 |
11-04-2025 |
|
7 |
Inspection, testing & certification of Safety Relief valves fitted with pressure vessels as per Rule 18 of SMPV (U) Rules, 2016 at Cryogenic plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064
(659.55 KB)
|
VECC/MEG/CPIS/NIT/PETTY WORKS/ B-14/724 Dated: 02/04/2025
|
03-04-2025 |
16-04-2025 |
|
8 |
Supply and fabrication of M.S & S.S structure for hanging the gas bag at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064.
(610.41 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/ 702 Dated: 27/03/2025
|
28-03-2025 |
07-04-2025 |
|
9 |
Cold Box shifting structure at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064
(428.34 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/ 703 Dated: 27/03/2025
|
28-03-2025 |
07-04-2025 |
|
10 |
Horticulture Service - Maintenance Based Model - Service with known quantity of Consumables; General Maintenance of Garden/Lawn/Field/Nursery/Park
(92.64 KB)
|
GEM/2025/B/6029034
|
24-03-2025 |
03-04-2025 |
|
11 |
Repairing of 12 TR Ductable Air-Conditioner.
(650.29 KB)
|
VECC/ ESD/ AC/Petty/B-11/612;Date: 18/03/2025
|
18-03-2025 |
25-03-2025 |
|
12 |
Roof treatment of Pre-Engineered Building (PEB) at Rajarhat campus of VECC, Kolkata-156.
(764.73 KB)
|
VECC/MEG/ESD/CES/PW/2024-25/187/ B-08/ 554 Date: 12.03.2025
|
12-03-2025 |
21-03-2025 |
|
13 |
On-site repair & renovation of RTC cooling tower Store Room truss support structure by using Pipe and angles at LCW Section, VECC.
(523.75 KB)
|
VECC/MEG/LCW/NIT/555 Dated: 12/03/2025
|
13-03-2025 |
25-03-2025 |
|
14 |
Electrification of Rooms inside DG building, VECC, Bidhan nagar, Kolkata.
(188.69 KB)
|
VECC/MEG/ESD/ES/2024-25/472 Dated: 24.02.2025
|
25-02-2025 |
04-03-2025 |
|
15 |
Operation and Maintenance of Water Supply Systems- Complete System
(98.26 KB)
|
GEM/2025/B/5832197 Date: 24-02-2025
|
24-02-2025 |
12-03-2025 |
|
16 |
Supply and fabrication of MS structure to change the ID fan at Cryogenic Plant Building
(383.3 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/B-06/468 Dated: 24/02/2025
|
24-02-2025 |
28-02-2025 |
|
17 |
Fabrication and Installation of Lead (Pb) sheet for X-ray shielding
(103.73 KB)
|
VECC/EHEPAG/CG/2025/02 Date: 13.02.2025
|
13-02-2025 |
20-02-2025 |
|
18 |
Supply, installation, testing, commissioning of 4 nos. of 4 MP, PoE based, Night vision capable, IP67 and ONVIF compatible CCTV Camera ,8 port PoE switch, 2TB surveillance Hard disk along with NVR 8 Channel and other accessories required for K-500 Superc
(2.29 MB)
|
VECC/APG/CCS/CAMERA/225 dated 27/01/2025
|
03-02-2025 |
05-02-2025 |
|
19 |
Repairing of Boom Barrier at main gate outside & Replacement of defective spare parts to make the boom barrier functional at VECC, Kolkata.
(211.07 KB)
|
VECC/C&IG/ TFSSD NIT/2024-25/B- 01/198 तारीख /Date: 23/01/2025
|
25-01-2025 |
31-01-2025 |
|
20 |
Rerouting & revamp of AHU drain pipe line at RTC corridor (ground floor) inside VECC office complex, 1/AF, Bidhannagar, Kolkata – 64.
(3.59 MB)
|
VECC/MEG/ESD/CES/NIT/T- 1912/B-02/95 Date 10.01.2025
|
16-01-2025 |
29-01-2025 |
|
21 |
Servicing of Canon Digital Multifunctional Printer model- iR2530 bearing Sl. No.RNS01147.
(807.3 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/139 Dated: 14/01/2025
|
16-01-2025 |
22-01-2025 |
|
22 |
CAMC for three (03) numbers of Deep Tube wells for two (02) years at VECC, Bidhan Nagar.
(754.62 KB)
|
VECC/MEG/ESD/AC/NIT/B-03/98 ;Dated- 10/01/2025
|
14-01-2025 |
27-01-2025 |
|
23 |
Electrification of Room No-60, VECC , Bidhan Nagar, Kolkata.
(212.75 KB)
|
VECC/MEG/ESD/ES/2024-25/B-04/112 Dated: 13.01.2025
|
13-01-2025 |
21-01-2025 |
|
24 |
Gas Cylinder refill
(157.89 KB)
|
VECC/EHEPAG/CG/2025/01 Date: 07.01.2025
|
07-01-2025 |
21-01-2025 |
|
25 |
Urgent repairing of underground water supply line of RIB Anex building and water supply line of TMU section, inside VECC office complex, 1/AF, Bidhannagar, Kolkata-64.
(886.39 KB)
|
VECC/MEG/ESD/CM/PW/2024-25/T-186/B-1/05 Date: 01.01.2025
|
02-01-2025 |
10-01-2025 |
|
26 |
Repair & renovation of cooling tower Store Room rain shed by using PPGL Sheets at LCW Section, VECC
(513.57 KB)
|
VECC/MEG/LCW/NIT/39 Dated: 06/01/2025
|
07-01-2025 |
21-01-2025 |
|
27 |
Supply, fabrication and fixing of sign board at VECC , Bidhan Nagar, Kolkata.
(177.43 KB)
|
VECC/MEG/ESD/ES/2024-25/B-65/33 Dated: 06.01.2025
|
06-01-2025 |
13-01-2025 |
|
28 |
External renovation of Main Building including face lifting of Director’s Office & others area at 1/AF, Bidhannagar, Kolkata-700 064
(3.35 MB)
|
VECC/MEG/ESD/CES/NIT/T-1911/B-64/2053 Dated: 24.12.2024
|
27-12-2024 |
13-01-2025 |
|
29 |
Operation and Maintenance of Electrical Systems/Electrical Installations - Complete System.
(92.85 KB)
|
GEM/2024/B/5747936 DT: 24.12.2024
|
24-12-2024 |
08-01-2025 |
|
30 |
Lifting and Placing of SS304 storage tank (600 kg) of ultra pure water system in RIB Annex at VEC Centre, Salt Lake Kolkata.
(77.04 KB)
|
VECC/RIBFG/2024/Minor Work/Lifting- SS304 Tank/ NIT/2042 Dated 23.12.2024
|
26-12-2024 |
06-01-2025 |
|
31 |
Dismantling and reinstallation of Sub-station exhaust fan and repairing of AHU fan.
(649.7 KB)
|
VECC/ ESD/ AC/Petty/ B-63/2005 dated: 20/12/2024
|
20-12-2024 |
03-01-2025 |
|
32 |
VECC/MEG/LCW/NIT/1950 Date: 18-12-2024
(661.74 KB)
|
Fabrication of stainless steel S shape pipe bend along with hydrotesting and insulation for MC-18 project at VECC, Kolkata.
|
19-12-2024 |
03-01-2025 |
|
33 |
On-site repair & renovation of FRP Cooling Tower drain & overflow pipelines including installation of isolation valves at LCW Section, VECC.
(544.86 KB)
|
VECC/MEG/LCW/NIT/1942 Dated: 17/12/2024
|
18-12-2024 |
02-01-2025 |
|
34 |
“Illumination of peripheral and internal roads including cable laying and termination at VECC, Bidhan Nagar, Kolkata.”
(3.17 MB)
|
VECC/MEG/ESD/ES/2024-25/B-62/1936 Date: 13.12.2024
|
17-12-2024 |
01-01-2025 |
|
35 |
Supply & installation of aluminium structure for HDPE block wall setting up/ hold up in side solid target cave of Medical Cyclotron Facility Chakgaria Kolkata 700094.
(413.83 KB)
|
VECC/ATG/MCFS/NIT/B-61/1914
|
16-12-2024 |
23-12-2024 |
|
36 |
Architectural Consultancy for renovation of Toilets of Various buildings at VECC Bidhannagar Campus and CHSS Dispensary inside VECC campus and VECC Anushakti Abasan, Bidhannagar.
(87.9 KB)
|
Bid No.: GEM/2024/B/5532997 Dated: 28.11.2024
|
28-11-2024 |
28-12-2024 |
|
37 |
"Waterproofing work at south side low bay of RTC building at VECC, 1/AF, Bidhannagar, Kolkata-700 064."
(763.55 KB)
|
VECC/MEG/ESD/CES/PW/T-180/2024-25/B-60/1868 Dated: 02.12.2024
|
02-12-2024 |
10-12-2024 |
|
38 |
"Supplying, installation and commissioning of various spare parts of garden wheel barrows including welding-paintings etc.for P&G section at all campuses of VECC, 1/AF, Bidhannagar, Kolkata-64."
(497.05 KB)
|
VECC/MEG/ESD/P&G/PW/T-185/2024-25/B-59/1863 Dated: 02.12.2024
|
02-12-2024 |
10-12-2024 |
|
39 |
SUPPLY, INSTALLATION, TESTING & Commissioning (SITC) OF TWO (02) NOS. OF DISPLAY BOARDS BEARING NAME & ADDRESS OF EASTERN REGIONAL REGULATORY CENTRE (ERRC), ATOMIC ENERGY REGULATORY BOARD (AERB) AT AMD-AERB BHAVAN, VECC’s RAJARHAT CAMPUS IIIB/4, NEWTOWN,
(373.37 KB)
|
AERB/ERRC/SERVICE/T-SITC-DB/2024/ November 27, 2024
|
28-11-2024 |
16-12-2024 |
|
40 |
On-site repair and overhauling of single stage horizontal back pull-out design centrifugal pump at RTC LCW plant, VECC, Kolkata.
(247.2 KB)
|
VECC/MEG/LCW/NIT/B-56/1840 Dated: 26-11-2024
|
27-11-2024 |
04-12-2024 |
|
41 |
Preventive maintenance of water supply pumps & motors at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64
(620.2 KB)
|
VECC/MEG/ESD/CM/PW/2024-25/T-184/B-55/1839 Date: 26.11.2024
|
27-11-2024 |
05-12-2024 |
|
42 |
Urgent P.H maintenance work as and when required at Anushakti Abasan and inside VECC office complex, 1/AF, Bidhannagar, Kolkata – 64.
(3.16 MB)
|
VECC/MEG/ESD/CMS/NIT/T-129/B-54/1806 Date:18.11.2024
|
21-11-2024 |
04-12-2024 |
|
43 |
Modification in power to Main Magnet Power supplies in SCC.
(689.75 KB)
|
VECC/MEG/ES/NIT/24-25/B-53/1782 DT: 08.11.2024
|
12-11-2024 |
25-11-2024 |
|
44 |
Providing granite flooring on the steps of Rangamanch and Aradhana etc. at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64.
(615.48 KB)
|
VECC/MEG/ESD/CM/PW/2024-25/T-183/1728 Date:30.10.2024
|
04-11-2024 |
12-11-2024 |
|
45 |
Renovation of workspace area with aluminum partition wall at the DG building, VECC..
(562.81 KB)
|
VECC/MEG/ES/NIT/24-25/B-49/716 DT: 28.10.2024
|
29-10-2024 |
18-11-2024 |
|
46 |
Shielding of 1.7 Tesla electromagnet.
(295.95 KB)
|
VECC/PG/ENPD/CT&NSS/2024/MinorWork/B-52/1742, Dated 05/11/2024
|
05-11-2024 |
18-11-2024 |
|
47 |
Roof treatment work of RIB Lab at VECC, 1/AF, Bidhannagar, Kolkata-700 064.
(1.2 MB)
|
VECC/MEG/ESD/CES/PW/2024-25/181/B-51/1721 Date: 29.10.2024
|
30-10-2024 |
08-11-2024 |
|
48 |
Replacement of gear oil and greasing of EOT Cranes.
(542.34 KB)
|
1731 dated 01.11.2024
|
04-11-2024 |
18-11-2024 |
|
49 |
Supply, fabrication and erection of pump room roofing shade on rooftop of RIB annex building at VECC, Kolkata.
(54.05 KB)
|
VECC/RIBFG/2024/Minor Work/Shade-Ultrapure Water System/NIT/1718 Dated 28.10.2024
|
29-10-2024 |
08-11-2024 |
|
50 |
Urgent repair of existing storm water pipeline and adjacent chamber in front of Ardra building at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64
(816.38 KB)
|
VECC/MEG/ESD/CM/PW/2024-25/182/ 1649 Date: 17.10.2024
|
21-10-2024 |
29-10-2024 |
|
51 |
Dismantling and re-installation of 4 TR industrial AC at main building ground floor
(649.89 KB)
|
VECC/ ESD/ AC/Petty/B-48/1658 ; Dated: 18/10/2024
|
18-10-2024 |
30-10-2024 |
|
52 |
Fixing/pasting dust resistant curtain on 10 power supply racks consisting of High Precision Quadrupole magnet power supplies at HR Cave 1
(519.42 KB)
|
VECC/RIBFG/ 2024/ Minor Work/Pasting dust resistant curtain/NIT/582 Date: 27/09/2024
|
30-09-2024 |
07-10-2024 |
|
53 |
Painting of cooling tower structural supports and pipe lines at LCW plant, VECC, Kolkata.
(118.2 KB)
|
VECC/MEG/LCW/NIT/1570 Date: 26-09-2024
|
27-09-2024 |
16-10-2024 |
|
54 |
FOCAL Interface board along with required components as listed in the annexure-1
(344.29 KB)
|
GOI/DAE/VECC/EHEPAG/SM/09-2024/1 Date: 20/09/2024
|
20-09-2024 |
26-09-2024 |
|
55 |
Supplying and stacking of various winter seedlings & garden soil at various campuses of VECC, 1/AF, Bidhan Nagar, Kolkata-700064
(744.88 KB)
|
VECC/MEG/ESD/P&G/PW/2024-25/179/B-44/1504 dated 12.09.2024
|
13-09-2024 |
24-09-2024 |
|
56 |
Replacement of 4 inch Reverse Osmosis membrane from FRP pressure vessel for existing RO plant at Kolkata,VECC
(136.73 KB)
|
VECC/MEG/LCW/NIT/1441 Date: 02-09-2024
|
04-09-2024 |
18-09-2024 |
|
57 |
Annual contract for repairing, internal painting and hygienic coating etc. of Departmental flats etc. at Anushakti Abasan, Hudco and Purbasha Housing of VECC, Kolkata.
(3.57 MB)
|
VECC/MEG/ESD/CMS/NIT/ T-1910/1416 Date 29.08.2024
|
06-09-2024 |
20-09-2024 |
|
58 |
Dismantling and air end repairing the compressor
(272.06 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/B-42/1404 Dated: 27/08/2024
|
28-08-2024 |
03-09-2024 |
|
59 |
Supply, Fabrication & Installation of ventilation duct for screw compressor in RIB LCW Plant at VECC Saltlake, Kolkata
(56.68 KB)
|
VECC/RIBFG/2024/Minor Work/Duct-Compressor/NIT/1400 Date: 26/08/2024
|
27-08-2024 |
06-09-2024 |
|
60 |
Onsite repair and replacement of shaft mechanical seal for high-pressure multistage centrifugal pump at LCW plant, MCF, Chak Garia, Kolkata.
(495.09 KB)
|
VECC/MEG/LCW/NIT/1313 Dated: 13-08-2024
|
16-08-2024 |
26-08-2024 |
|
61 |
Eradication of Rat, Lizard and Bees/Wasps Menace including post construction anti termite treatment in Offices and Laboratories etc. in three campuses (i.e at Bidhannagar, MCF Chakgaria & Rajarhat Campus) of VECC, Kolkata.
(3.05 MB)
|
VECC/MEG/ESD/CMS/ NIT/T-128/ 1276 Date: 05.08.2024
|
08-08-2024 |
21-08-2024 |
|
62 |
Renovation of various labs (e.g. INO Lab, Trap Lab etc.) near DG Building including others miscellaneous civil works at 1/AF, Bidhannagar, Kolkata-64 .
(2.94 MB)
|
VECC/MEG/ESD/CES/NIT/T-1909/B-40/1253 Dated: 31.07.2024
|
02-08-2024 |
19-08-2024 |
|
63 |
Dismantling and air end repairing the compressor
(733.89 KB)
|
VECC/MEG/CP&IS/NIT/PETTY WORKS/1222 Dated: 29/07/2024
|
30-07-2024 |
06-08-2024 |
|
64 |
Epoxy flooring & PU painting at SCC building including other miscellaneous civil works in different labs at Bidhannagar campus of VECC, Kolkata- 700064.
(635.61 KB)
|
VECC/MEG/ESD/CES/NIT/T-1908/1171 Dated 19/07/2024
|
23-07-2024 |
07-08-2024 |
|
65 |
Onsite replacement of exhausted super charged resins and re-filling with new supercharged resins for FRP mixed bed unit at MCF, LCW Section, VECC.
(108.81 KB)
|
VECC/MEG/LCW/NIT/1161 Dated: 19-07-2024
|
22-07-2024 |
01-08-2024 |
|
66 |
Annual contract for repairing, internal painting and hygienic coating etc. of Departmental flats etc. at Anushakti Abasan, Hudco and Purbasha Housing of VECC, Kolkata.
(3.56 MB)
|
VECC/MEG/ESD/CMS/NIT/ T-1907 / B-39/1112 Date 15.07.2024
|
19-07-2024 |
05-08-2024 |
|
67 |
On site repair & renovation of cooling tower Cold basin support structure & rain shed support structure at LCW Section, VECC
(477.8 KB)
|
VECC/MEG/LCW/NIT/1121 Dated: 16/07/2024
|
18-07-2024 |
29-07-2024 |
|
68 |
Replacement of damaged window glass panes in different departmental flats at Anushakti Abasan, Hudco, Purbasha including maintenance of aluminium door and window shutters in all three campuses of VECC (i.e. Bidhanagar, Rajarhat and MCF Chakgaria).
(3.42 MB)
|
VECC/MEG/ESD/CMS/NIT/T- 1906/ 1072 Date 09.07.2024
|
11-07-2024 |
24-07-2024 |
|
69 |
Providing Electrical power connection to different loads of Helium Laboratory at VECC, Bidhan Nagar, Kolkata.
(2.63 MB)
|
VECC/MEG/ES/NIT/2024-25/B-38/1049 Dated 04.07.2024
|
06-07-2024 |
20-07-2024 |
|
70 |
Annual contract for maintenance of different P.H. installations at Bidhannagar campus of VECC, 1/AF, Bidhannagar, Kolkata – 64
(2.71 MB)
|
VECC/MEG/ESD/CMS/ NIT/T- 127/ B-37/1024 Date: 02.07.2024
|
05-07-2024 |
19-07-2024 |
|
71 |
Complete cleaning of Kitchen hood exhaust system
(653.32 KB)
|
VECC/ ESD/ AC/Petty/ B-36/961 dated: 26/06/2024
|
26-06-2024 |
09-07-2024 |
|
72 |
Cleaning of filters (Pre Filter) of AHU, FCU& Exhaust etc.
(650.45 KB)
|
VECC/ ESD/ AC/Petty/ B-35/922 dated: 20/06/2024
|
20-06-2024 |
03-07-2024 |
|
73 |
Supply, installation, testing & commissioning of in line Vertical Multistage Centrifugal Booster pump to enhance the line pressure for ECR Coils at LCW section, VECC.
(153.35 KB)
|
VECC/MEG/LCW/NIT/919 Dated: 20/06/2024
|
24-06-2024 |
08-07-2024 |
|
74 |
Fabrication and Supply of Support Structure for MC18 Injection Beamline
(65.39 KB)
|
VECC/MEG/ATDMS/NIT/T/B-34/890, Dated - 11/06/2024
|
18-06-2024 |
08-07-2024 |
|
75 |
Annual contract for maintenance of two numbers tube wells including submersible pumps at Anushakti Abasan, 1/AF, Bidhannagar, Kolkata – 64
(3.37 MB)
|
VECC/MEG/ESD/CMS/ NIT/T-126 / B-33 / 875 Date: 06.06.2024
|
13-06-2024 |
26-06-2024 |
|
76 |
Renovation of water testing lab that include replacement of window blinds, table top glass, supply of lab accessories and painting at LCW Section, VECC, Kolkata.
(625.9 KB)
|
VECC/MEG/LCW/NIT/854 Dated: 04-06-2024
|
05-06-2024 |
13-06-2024 |
|
77 |
Supply of SS304L fittings, Welding and Radiography testing of external SS304L pipe for Helium Liquefier test set-up at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064.
(614.91 KB)
|
VECC/MEG/CP&IS/NIT/Petty Works/ 824 dated 29.05.2024
|
04-06-2024 |
13-06-2024 |
|
78 |
Modification of pipelines for coolant supply to turboexpanders of new liquefier developed inhouse at CPI Section at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064
(618.02 KB)
|
VECC/MEG/CP&IS/NIT/Petty Works/ 823 dated 29.05.2024
|
04-06-2024 |
13-06-2024 |
|
79 |
Miscellaneous services related to Medical Dispensary” at Medical Section, VECC and Anushakti Abasan Medical Dispensary, VECC, Kolkata.
(2.51 MB)
|
VECC/ATG/NIT/T-1905/829 Dated 30/05/24
|
31-05-2024 |
13-06-2024 |
|
80 |
Nitrogen Gas refilling for Medical Cyclotron Facility Chakgaria Kolkata 700094.
(292.82 KB)
|
VECC/ATG/MCFS/2024-25 /B-29/779
|
28-05-2024 |
05-06-2024 |
|
81 |
Fabrication of rain shed roofs using corrugated sheet above DG Sets at VECC.
(590.75 KB)
|
VECC/MEG/ES/NIT/24-25/B-27/771 DT: 22.05.2024
|
23-05-2024 |
04-06-2024 |
|
82 |
Assisting in operation and maintenance of various detectors such as charge particle, neutron and gamma, high vacuum systems, and instruments in laboratories of Cryogenic Trap Facility, XRD, FESEM, UTM, PPMS, TGA/DSC, UV-Vis spectrometer etc., at VECC
(90.49 KB)
|
GEM/2024/B/4969557
|
22-05-2024 |
03-06-2024 |
|
83 |
Repairing & overhauling of Automatic power factor correction (APFC) panels.
(87.92 KB)
|
GEM/2024/B/4867669 Dated: 13-05-2024
|
15-05-2024 |
27-05-2024 |
|
84 |
Shifting of hand portable shielding concrete blocks and other cleaning job
(2.17 MB)
|
VECC/NIT/T/MEG/ATD(M)S/2024/754, Dated - 15/05/2024
|
15-05-2024 |
16-05-2024 |
|
85 |
Onsite repair and overhauling of high pressure vertical multistage centrifugal pump at MCF, Chak Garia, Kolkata.
(461.82 KB)
|
VECC/MEG/LCW/NIT/737 Dated: 10-05-2024
|
13-05-2024 |
20-05-2024 |
|
86 |
Supplying, installation and commissioning of various spare parts of few machines including servicing etc. for P&G section at all campuses of VECC, 1/AF, Bidhannagar, Kolkata-64
(827.67 KB)
|
VECC/MEG/ESD/P&G/PW/2024-25/178/ 691 Date: 06-05-2024
|
07-05-2024 |
15-05-2024 |
|
87 |
Fabrication and supply of LCW Hose connectors for RF Transmitters as per drawing at RIB LCW plant.
(37.17 KB)
|
VECC/RIBFG/2024/Minor Work/LCW-RFConn/NIT/664 Dated 01.05.2024
|
02-05-2024 |
13-05-2024 |
|
88 |
"Miscellaneous services related to Medical Dispensary" at Medical Section, VECC and Anushakti Abasan Medical Dispensary, VECC, Kolkata.
(704.81 KB)
|
VECC/ATG/NIT/T-1903/643 DT: 26/04/2024
|
30-04-2024 |
13-05-2024 |
|
89 |
Repairing of Canteen Equipment at MCF, Chakgaria
(540.3 KB)
|
VECC/MEG/ES/NIT/2023-24/B-25/639 Date: 26.04.2024
|
29-04-2024 |
07-05-2024 |
|
90 |
Development of Vertical Garden including all allied civil work etc. at Bidhannagar campus of VECC, 1/AF, Kolkata-700 064
(3.71 MB)
|
VECC/MEG/ESD/P&G/NIT/T-1902/621 Dated: 23.04.2024
|
25-04-2024 |
08-05-2024 |
|
91 |
Construction of rain shed over emergency stair adjacent to PEB including installation of PVC water tank at Rajarhat campus of VECC, Kolkata- 700 156
(3.09 MB)
|
VECC/MEG/ESD/CES/NIT/T-1900/593 Dated: 16.04.2024
|
18-04-2024 |
06-05-2024 |
|
92 |
Fabrication work for closing of open floor cut outs, repairing of door locks of electrical distribution box & Ventilation hole cut out of rolling shutter at VECC Bidhan Nagar, Kolkata-700064.
(878.66 KB)
|
VECC/MEG/ES/24-25/B-23/589 Date: 16.04.2024
|
16-04-2024 |
24-04-2024 |
|
93 |
Fabrication of Target Seal Assembly
(2.32 MB)
|
VECC/NIT/T/MEG/ATD(M)S/2024/592, Dated - 16/04/2024
|
17-04-2024 |
01-05-2024 |
|
94 |
Onsite replacement of 4 inch RO membrane from FRP pressure vessel for existing RO plant at Kolkata,VECC
(79.7 KB)
|
VECC/MEG/LCW/NIT/580 Date: 12-04-2024
|
15-04-2024 |
24-04-2024 |
|
95 |
Epoxy flooring & PU painting at SCC building including other miscellaneous civil works in different labs at Bidhannagar campus of VECC, Kolkata- 700064.
(626.78 KB)
|
VECC/MEG/ESD/CES/NIT/T-1901/561 Dated 09/04/2024
|
11-04-2024 |
27-04-2024 |
|
96 |
FABRICATION, SUPPLY AND INSTALLATION OF PIPELINES TO CONNECT CHILLER AND CRYOCOOLER COMPRESSOR AT VECC, KOLKATA.
(3.71 MB)
|
VECC/ATG/NIT/T-/545
|
08-04-2024 |
22-04-2024 |
|
97 |
Re-installation of Split ACs at different campuses of VECC
(1013.14 KB)
|
VECC/ESD/AC/Petty/B-21/551 ; Dated: 05/04/2024
|
08-04-2024 |
17-04-2024 |
|
98 |
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
(90.27 KB)
|
GEM/2024/B/4833017
|
03-04-2024 |
17-04-2024 |
|
99 |
Assisting in various office woks at CRPU and CRSU, VECC, Kolkata using computer, xeroxing, maintenance and distribution of various office documents.
(92.21 KB)
|
GEM/2024/B/4823039 Date 01-04-2024
|
01-04-2024 |
11-04-2024 |
|
100 |
Assisting in the round-the-clock shift duty for operation and maintenance of the power supplies along with the fabrication works for the in-house development of the power supplies at VECC, Kolkata – 700064.
(95.76 KB)
|
GEM/2024/B/4704142 Date: 01-04-2024.
|
01-04-2024 |
11-04-2024 |
|
101 |
Assisting in the maintenance of Fire Detection System (FDS) and also assisting in the maintenance of Electronics Equipment related to Security and Surveillance systems at VECC and all other campuses of VECC including Anushakti Abasan, Kolkata – 700064.
(95.49 KB)
|
GEM/2024/B/4806114 Date: 01-04-2024
|
01-04-2024 |
11-04-2024 |
|
102 |
Testing of transformer oil
(84.48 KB)
|
GEM/2024/B/4606139 Date: 20.03.2024
|
20-03-2024 |
02-04-2024 |
|
103 |
Onsite repair and service of Delair make refrigerant air dryer at VECC, Salt Lake, Kolkata
(526.8 KB)
|
VECC/MEG/LCW/NIT/439 Dated: 14-03-2024
|
18-03-2024 |
26-03-2024 |
|
104 |
Supplying & stacking of various gardening items at different campuses of VECC
(735.62 KB)
|
VECC/MEG/ESD/P&G/PW/2023-24/177/B-19/417 Date: 08.03.2024
|
11-03-2024 |
19-03-2024 |
|
105 |
Shifting of materials at VECC, 1/AF, Bidhan Nagar Kolkata-64.”
(717.6 KB)
|
VECC/MEG/ES/NIT/2023-24/B-18/411 Date: 07.03.2024
|
08-03-2024 |
18-03-2024 |
|
106 |
Replacement of LED Landscape Light fittings.
(716.66 KB)
|
VECC/MEG/ES/NIT/2023-24/B-17/410 Date: 07.03.2024
|
08-03-2024 |
18-03-2024 |
|
107 |
Assisting in operation and maintenance of various detectors such as charge particle, neutron and gamma, high vacuum systems, and instruments in laboratories of Cryogenic Trap Facility, XRD, FESEM, UTM, PPMS, TGA/DSC, UV-Vis spectrometer etc., at VECC
(89.6 KB)
|
GEM ID: GEM/2024/B/4621913
|
07-03-2024 |
22-03-2024 |
|
108 |
Maintenance of Parks & Garden at Medical cyclotron facility, VECC, Budherhat Road,P.O – Panchasayar, Kolkata 700094
(89.46 KB)
|
GEM ID:GEM/2024/B/4525732
|
29-02-2024 |
14-03-2024 |
|
109 |
Transformer oil filtration at VECC, Rajarhat campus.
(521.63 KB)
|
VECC/MEG/ES/23-24/B-11/340 DT: 26.02.2024
|
27-02-2024 |
11-03-2024 |
|
110 |
Maintenance of Parks & Garden at Bidhannagar including Anushakti Abasan & Rajarhat campus of VECC at 1/AF, Bidhannagar, Kol- 64.
(89.55 KB)
|
GEM/2024/B/4423799 Dated: 28.02.2024
|
28-02-2024 |
13-03-2024 |
|
111 |
Providing & fixing of bulging floor tiles at library including other miscellaneous civil works at Bidhannagar campus of VECC, Kolkata- 700064.
(126.02 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/176/B-12/359 Date: 28.02.2024
|
28-02-2024 |
07-03-2024 |
|
112 |
Providing & fixing of Aluminium windows at Silicon Detector Lab of Main building at Bidhannagar campus of VECC, Kolkata- 700064.
(129.58 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/175/B-09/335 Date: 22.02.2024
|
23-02-2024 |
04-03-2024 |
|
113 |
Shifting of FSD571SFC air-end and motor from their base inside the helium compressor module, and reinstalling them following repairs & maintenance
(632.9 KB)
|
VECC/MEG/CP&IS/2024/SP/B-07/315 Dated: 20/02/2024
|
21-02-2024 |
29-02-2024 |
|
114 |
Transformer oil filtration at VECC, Rajarhat campus.
(239.04 KB)
|
VECC/MEG/ES/NIT/2023-24/B-08/317 DT: 20.02.2024
|
22-02-2024 |
29-02-2024 |
|
115 |
Dismantling and reinstallation of air end for repairing the compressor #3 installed at Cryogenic Plant Building
(564.1 KB)
|
VECC/MEG/CP&IS/2024/SP/B-06/306 Dated: 19/02/2024
|
20-02-2024 |
29-02-2024 |
|
116 |
Rolling shutter modification and overhauling at VECC, Kolkata.
(237.3 KB)
|
VECC/MEG/ES/NIT/2023-24/B-05/205 DT: 05.02.2024
|
05-02-2024 |
13-02-2024 |
|
117 |
Maintenance of Canon Digital Multifunctional Printer Model IR2530 bearing Sl. No. RNS01147 at Cryogenic Plant Building, VECC
(223.98 KB)
|
VECC/MEG/CP&IS/2024/SP/B-04/184 Dated: 31/01/2024
|
02-02-2024 |
08-02-2024 |
|
118 |
Accidental damage repair and painting of Scorpio (Vehicle No. WB 02 AA 3410)
(112.78 KB)
|
VECC/MEG/ TMU/ 3410/2024/176 Date: 30 January 2024
|
01-02-2024 |
07-02-2024 |
|
119 |
Machining & Supply of Ball Screw
(943.94 KB)
|
VECC/NIT/T/MEG/ATD(M)S/2024/167 dated: 29/01/2024
|
29-01-2024 |
12-02-2024 |
|
120 |
VECC-Through Cleaning of Micro/Fine Filters for HVAC
(651.13 KB)
|
VECC/ESD/AC/Petty/B-03/145 dated: 22/01/2024
|
22-01-2024 |
02-02-2024 |
|
121 |
Pruning-cleaning of coconut and other trees at Bidhannagar campus including Anushakti Abasan of VECC, Kolkata-700064
(162.65 KB)
|
VECC/MEG/ESD/P&G/PW/2023-24/86 Date: 12.01.2024
|
12-01-2024 |
22-01-2024 |
|
122 |
Repairing of Sharp make Xerox machine model AR6020V at VECC Kolkata.
(701.04 KB)
|
VECC/MEG/MMS/NIT/35 dated 04.1.2024
|
05-01-2024 |
19-01-2024 |
|
123 |
Fabrication and supply of LCW Hose connectors for RFQ at RIB in VECC.
(1.9 MB)
|
VECC/RIBFG/2023/Minor Work/LCW-RFQ/NIT/17 Dated 02.01.2024
|
04-01-2024 |
15-01-2024 |
|
124 |
Preventive maintenance of water supply pumps & motors at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64
(616.71 KB)
|
VECC/MEG/ESD/CM/PW/2023-24/173/ B-58/2016 Dated:20.12.2023
|
20-12-2023 |
27-12-2023 |
|
125 |
Dismantling & disposed of an old, damaged reciprocating compressor and construction of RCC make foundation base for installation of newly procured screw compressor at LCW Section, VECC.
(528.21 KB)
|
VECC/MEG/LCW/NIT/2072 Dated: 27-12-2023
|
28-12-2023 |
08-01-2024 |
|
126 |
Assisting in various office works at Accounts, Administration and Security Section, VECC using computer, Xeroxing, maintenance and distribution of various office documents
(588.63 KB)
|
VECC/ATG/NIT/T-1898/1917 Dated: 05/12/2023
|
06-12-2023 |
22-12-2023 |
|
127 |
Onsite service including cleaning & flashing of radiator for Kirloskar make air screw compressor at VECC, Kolkata.
(524.39 KB)
|
VECC/MEG/LCW/NIT/ 1894 Dated: 01-12-2023
|
05-12-2023 |
19-12-2023 |
|
128 |
Proper modification of ladder fitted with Watch Tower at Main Gate for safe ascending and descending purpose at Bidhannagar campus of VECC, Kolkata- 700 064.
(381.85 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/172/B-50/1872 dated: 28.11.2023
|
28-11-2023 |
06-12-2023 |
|
129 |
Renovation of one (01) nos. ladies toilet inside CRSU including fixing of one (01) nos aluminium window at main building (room no. 301) and providing roofing shed at security kiosk at Bidhannagar campus of VECC, Kolkata- 700 064.
(400.09 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/171/B-51/1598 dated: 21.11.2023
|
22-11-2023 |
01-12-2023 |
|
130 |
Supply and installation of filter cartridge and heating element for 500 LPH transformer oil fitter machine at VECC, Kolkata
(240.38 KB)
|
VECC/MEG/ES/NIT/2023-24/B-52/1858 DT: 22.11.2023
|
23-11-2023 |
01-12-2023 |
|
131 |
Laying of power cable, installation of Earthing pits and mounting of Panel Fans at VECC.
(592.97 KB)
|
VECC/MEG/ES/NIT/23-24/B-49/1814 DT: 13.11.2023
|
17-11-2023 |
30-11-2023 |
|
132 |
On site repair & renovation of SCC cooling tower Cold basin support structure & fan motor access ladder by using MS angle, MS Pipe & FRP sheets etc. at LCW Section, VECC.
(461.58 KB)
|
VECC/MEG/LCW/NIT/1759 Date: 06-11-2023
|
07-11-2023 |
20-11-2023 |
|
133 |
Fabrication and Supply of Outer shaft for Carriage Assembly
(2.69 MB)
|
VECC/NIT/ATDS(Mech)/1737, Dated - 01/11/2023
|
01-11-2023 |
20-11-2023 |
|
134 |
Onsite repair and gas charging of Atlas Copco make refrigerant air dryer for compressed air system at MCF, Chak Garia, Kolkata.
(108.28 KB)
|
VECC/MEG/LCW/NIT/1653 Dated: 11-10-2023
|
12-10-2023 |
25-10-2023 |
|
135 |
Onsite replacement of exhausted super charged resins and re-filling with new supercharged resins for FRP mixed bed unit at MCF, LCW Section,VECC.
(682.69 KB)
|
VECC/MEG/LCW/NIT/1592 Date: 03-10-2023
|
04-10-2023 |
13-10-2023 |
|
136 |
Miscellaneous electrical works at VECC, Bidhan Nagar, Kolkata
(692.11 KB)
|
VECC/MEG/ESD/ES/2023-24/B-43/1589 Date: 03.10.2023
|
03-10-2023 |
11-10-2023 |
|
137 |
Repairing of electrical panel doors at VECC, Bidhan Nagar, Kolkata.
(579.43 KB)
|
VECC/MEG/ESD/ES/2023-24/B-42/1583 Date:29.09.2023
|
27-09-2023 |
06-10-2023 |
|
138 |
Maintenance Contract (AMC) for the year 2023-24 for Wonderware SCADA.
(1.57 MB)
|
VECC/NIT/T/MEG/CIS/B-41/1551: Dated - 21/09/2023
|
25-09-2023 |
20-10-2023 |
|
139 |
Overhauling and onsite regeneration of MSRL mixed bed unit for RO plant at RTC LCW system, VECC, Kolkata
(517.78 KB)
|
VECC/MEG/LCW/NIT/1553 Dated: 22-09-2023
|
25-09-2023 |
05-10-2023 |
|
140 |
Supply and installation of MS Perforated Sheet and door hinge of 04 Nos. DG Sets at VECC campus, Bidhan Nagar, Kolkata-700064.
(239.63 KB)
|
VECC/MEG/ES/NIT/2023-24/B-40/1538 Dated: 18.09.2023
|
18-09-2023 |
22-09-2023 |
|
141 |
Onsite repair and overhauling of horizontal multistage centrifugal pump having capacity 12 m3/hr with 150 MWC head for material science LCW plant at MCF,VECC, Kolkata
(528.9 KB)
|
VECC/MEG/LCW/NIT/1506 Date: 14-09-2023
|
19-09-2023 |
29-09-2023 |
|
142 |
Supply, Cleaning, Fitting, Erection, Welding, and Radiography Test of the External Piping Works for Helium Liquefier Test Set-up #1 at Cryogenic Plant Building, VECC, 1/AF, Bidhan Nagar, Kolkata – 700064.
(1.09 MB)
|
VECC/NIT/MEG/CPIS/B-27/1475 Dated:08/09/2023
|
11-09-2023 |
22-09-2023 |
|
143 |
Comprehensive Annual Maintenance Contract (CAMC) for the RFID Card Printer for 2 years (Dual side printer with laminator) (Make: FARGO, Model No.: HDP 5000, Sl. No.: B4260381) of VECC, Kolkata - 700064.
(842.8 KB)
|
VECC/NIT/C&IG/TFSSD/RFID Printer/1460 Date: 05/09/2023
|
05-09-2023 |
14-09-2023 |
|
144 |
Miscellaneous shifting works inside VECC campus, Bidhan Nagar Kolkata. |
VECC/MEG/ESD/ES/PW/2023-24/B-38/1381 Date: 24.08.2023
|
24-08-2023 |
30-08-2023 |
|
145 |
Comprehensive Annual maintenance for Clean room of PMD Lab at VECC
(1.23 MB)
|
VECC/EHEPAG/NIT/B-30/1157 Dated: 13-07-2023
|
14-07-2023 |
30-08-2023 |
|
146 |
Supply & fixing of Aluminium windows at N.K. Ganguly Lecture Hall of Main building at Bidhannagar campus of VECC, Kolkata- 700064.
(530.15 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/169/B-37/1366 Date: 21.08.2023
|
21-08-2023 |
29-08-2023 |
|
147 |
Supply & installation of lights at MCF, Chakgaria
(971.84 KB)
|
VECC/MEG/ES/NIT-23-24/B-36/1357 Date: 18.08.2023
|
21-08-2023 |
30-08-2023 |
|
148 |
Supply & laying of vitrified tiles flooring at room no. 406 of C&IG building at Bidhannagar campus of VECC, Kolkata- 700064.
(533.75 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/170/B-35/1147 Date: 16.08.2023
|
16-08-2023 |
23-08-2023 |
|
149 |
Supplying and stacking of various types of Organic manures and Fertilizers at all campuses of VECC, 1/AF, Bidhan Nagar, Kolkata-700064 |
VECC/MEG/ESD/P&G/PW/2023-24/168/B-34/1332 Date: 14.08.2023
|
14-08-2023 |
23-08-2023 |
|
150 |
Onsite repair and overhauling of high pressure vertical multistage centrifugal pump-motor set for RO System of Water Treatment Plant at MCF, Chak Garia, Kolkata.
(109.36 KB)
|
VECC/MEG/LCW/NIT/1314 Date: 09-08-2023
|
10-08-2023 |
22-08-2023 |
|
151 |
Fabrication of Structure for rotating coil magnetic field measurement |
VECC/NIT/ATDS(Mech.)/1232, Dated - 27/07/2023
|
28-07-2023 |
07-08-2023 |
|
152 |
Supply, Cleaning, Fitting, Erection, Welding, and Radiography Test of the Internal Piping Works for Helium Liquefier Test Set-up #1 at Cryogenic Plant Building, VECC, 1/AF, Bidhan Nagar, Kolkata – 700064.
(1.09 MB)
|
VECC/NIT/MEG/CPIS/B-28/1240 Dated:28/07/2023
|
31-07-2023 |
25-08-2023 |
|
153 |
Comprehensive Annual maintenance for Clean room of PMD Lab at VECC.
(1.23 MB)
|
VECC/EHEPAG/NIT/B-30/1157
|
14-07-2023 |
11-08-2023 |
|
154 |
Repairing of 11 KV Vacuum Circuit Breaker at Medical Cyclotron facility, Chakgaria
(1.32 MB)
|
VECC/MEG/ES/NIT-23-24/B-32/1219 Date: 26.07.2023
|
26-07-2023 |
08-08-2023 |
|
155 |
Architectural drawing & 3-D Layout of ANURIB phase-1 building
(1.09 MB)
|
VECC/RIB/Works/2023/Arch/ANURIB/NIT/1217
|
26-07-2023 |
14-08-2023 |
|
156 |
Comprehensive Annual maintenance for Clean room of PMD Lab at VECC.
(1.23 MB)
|
VECC/EHEPAG/NIT/B-30/1157
|
14-07-2023 |
27-07-2023 |
|
157 |
Comprehensive Annual Maintenance Contract (CAMC) for the Electronic Private Automatic Branch Exchange (EPABX) System (Make: Tadiran; Model: Coral -5000 EPABX) along with FCB and 500 analog telephone sets working round the clock in VECC Kolkata-700064
(715.45 KB)
|
VECC/C&IG/TFSSD NIT/EPABX/23-24/1034
|
21-06-2023 |
05-07-2023 |
|
158 |
Shifting of 1.7T magnet from RIB bay to Cryo-Electronics and Trap Lab Near Tea-Pantry at 1/AF, Bidhan Nagar, Kolkata- 700064 .....
(257.31 KB)
|
VECC/NIT/ENPD/CTS/PETTY WORKS/B-22 dated 08-06-2023
|
09-06-2023 |
19-06-2023 |
|
159 |
Fabrication, transportation, supply of the control panel, supply of different electrical items like (MCB, Contactor, Power Supply, control & power cables etc.) for Automation and Electrical control interfacing of Siemens PLC for new liquefier Fabrication
(276.8 KB)
|
VECC/NIT/MEG/CPIS/B-23/996 dated 12-06-2023
|
13-06-2023 |
03-07-2023 |
|
160 |
Cleaning of filters (Pre Filter) of AHU, FCU & Exhaust etc.
(649.89 KB)
|
VECC/ESD/AC/Petty/B-24/1010 dated 13/06/2023
|
14-06-2023 |
27-06-2023 |
|
161 |
Fabrication and supply of R.F Panel driving shaft.
(371.28 KB)
|
VECC/MEG/MES/NIT/T-002/BCM-23/17/889 Dated:22-05-2023
|
24-05-2023 |
02-06-2023 |
|
162 |
Annual Maintenance Contract (AMC) for Reverse Osmosis Water Purifier at VECC.
(1.16 MB)
|
VECC/ESD/AC/NIT/B-16/852 Dated: 15/05/2023
|
16-05-2023 |
30-05-2023 |
|
163 |
Renovation of 02 nos. toilet at ground floor of sec building at VEee, lIAF, Bidhannagar, Kolkata- 700 064.
(473.16 KB)
|
VECC/MEG/ESD/CES/PW/2023-24/166/895 Date: 23/05/2023
|
23-05-2023 |
31-05-2023 |
|
164 |
Radiation shielding of shield door rail trenches and local shielding of target stations at MCF, VECC.
(1.5 MB)
|
VECC/MEG/MCP/NIT/2023/835 Dated 11/05/2023
|
16-05-2023 |
31-05-2023 |
|
165 |
Supply & installation of 11 TR Ductable AC for PSI and Cryogenic UPS Room at VECC.
(768.22 KB)
|
VECC/ESD/AC/NIT/B-14/844; Dated 15/05/2023
|
15-05-2023 |
31-05-2023 |
|
166 |
Fabrication & Supply of LCW Hose connector as per drawing and specificationat RIB LCW Plant.
(161.08 KB)
|
VECC/RIB/Works/2023/Hose Connectors/BKN/TS/851 Dated 15.05.2023
|
19-05-2023 |
01-06-2023 |
|
167 |
Supply, Installation, Testing & commissioning of Screw type air compressor along with complete air treatment system
(1.4 MB)
|
VECC/MEG/FS/NIT/2023/849 Dated 15/05/2023
|
19-05-2023 |
10-06-2023 |
|
168 |
Cleaning, inspection and annual load testing of EOT cranes & chain pulley blocks.
(2.95 MB)
|
VECC/MEG/MMS/2023/NIT/908 Date:24/05/2023
|
25-05-2023 |
15-05-2023 |
|