Sl. No. Name of Work NIT No. Start Date of Sale End Date of Sale Corrigendum Document
1 Material shifting from K130 high bay and miscellaneous items for MC-18 project at VECC, Kolkata (681.79 KB) VECC/ MEG/NIT/ 271 18-02-2026 24-02-2026

2 Operation and Maintenance of Electrical System and installation at MCF and Rajarhat site (102.96 KB) GEM/2026/B/7102137 Dated:10/02/2026 10-02-2026 23-02-2026

3 Operation And Maintenance Of Lifts (Elevators) - Complete System. (101.47 KB) GEM/2026/B/7105270 Dated: 10-02-2026 10-02-2026 23-02-2026

4 Operation And Maintenance Of Lifts (Elevators) - Complete System (98.84 KB) GEM/2026/B/7106177 Dated: 10-02-2026 10-02-2026 23-02-2026

5 Cable cutting, marking and laying of control cables for MC-18 cyclotron project at VECC, Kolkata-64 (624.06 KB) VECC/ECRISFG/CCS/NIT/225 dated 10/02/2026 12-02-2026 18-02-2026

6 Electrical renovation of Staff quarters at Anushakti Abasan, VECC. (528.26 KB) VECC/MEG/ES/NIT/25-26/B-06/190 DT: 04.02.2026 04-02-2026 25-02-2026

7 Fabrication of water distribution manifolds and piping for cooling Magnet components of MC-18 project at VECC, Kolkata (521.23 KB) VECC/MEG/LCW/NIT/130 Dated: 19/01/2026 22-01-2026 05-02-2026

8 Development of Vertical Garden at Bidhannagar campus of VECC, 1/AF, Bidhannagar, Kolkata-700 064 (3.77 MB) VECC/MEG/ESD/P&G/NIT/T-1922/B-04/78 Dated: 13/01/2026 15-01-2026 31-01-2026

9 Detailed analysis of work methodology for internal structural members for retrofitting work of SCC building at 1/AF, Bidhannagar, Kolkata- 700064. (876.88 KB) VECC/MEG/ESD/CES/PW/2025-26/T-199/B-02/55 Date:09-01-2026 13-01-2026 21-01-2026

10 Construction of pre engineered structure for Power Supply, Control room and other miscellaneous works of MC18 project facility at Bidhannagar campus of VECC, Kolkata. (3.39 MB) VECC/MEG/ESD/CMS/NIT/ T-1921/B-01/31 Date 07.01.2026 09-01-2026 28-01-2026

11 Operation and Maintenance Of Electrical Systems/Electrical Installations. (102.02 KB) GEM/2025/B/6970614 DT: 07.01.2026 07-01-2026 20-01-2026

12 Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Buyer. (96.35 KB) GEM/2025/B/6898729 DT: 07.01.2026 07-01-2026 19-01-2026

13 Supply installation of Electrical distribution panels for SCC LCW system in VECC. (773.76 KB) VECC/MEG/ES/NIT/25-26/B-64/37 DT: 07.01.2026 07-01-2026 28-01-2026

14 Electrical renovation of Staff quarters at Anushakti Abasan, VECC. (536.15 KB) VECC/MEG/ES/NIT/25-26/B-63/38 DT: 07.01.2026 07-01-2026 28-01-2026

15 Assisting in various office works at Accounts, Administration and Security Section, VECC using computer, Xeroxing, maintenance and distribution of various office documents. (596.9 KB) VECC/MEG/ES/NIT/24-25/B-62/2515 DT: 30.12.2025 06-01-2026 19-01-2026

16 Supply, fabrication and Installation of a better Coalesce Type Oil Filter with shell in the Air Line (565.64 KB) VECC/MEG/CPID/NIT/PETTY WORKS/B-59/2476 Dated: 17/12/2025 17-12-2025 26-12-2025

17 Supply and installation of Spring Charging motor of 33KV outdoor Vacuum Circuit Breaker at VECC, Bidhan Nagar campus (201.99 KB) VECC/MEG/ESD/ES/2025-26/B-60/2478 Date:17/12/2025 18-12-2025 24-12-2025

18 Face lifting work of Directors Office and other miscellaneous civil works at Main Building at VECC, 1/AF, Bidhannagar, Kolkata- 700064. (3.07 MB) VECC/MEG/ESD/CES/NIT/T- 1920/2452 Dated-12.12.2025 17-12-2025 03-01-2026

19 Upgradation of VOIP PRI gateway for SIP trunk between Matrix make Eternity ME16SDC EPBAX system and BSNL at VECC, Chak Garia (603.68 KB) VECC/CIG/RKP/Minor Works/2025/04 05-12-2025 12-12-2025

20 Waterproofing work at RTC Lowbay (North) at Bidhannagar campus of VECC, Kolkata- 700064. (883.09 KB) VECC/MEG/ESD/CES/PW/2025-26/T-198/B-57/2354 Date:02.12.2025 03-12-2025 11-12-2025

21 Supply, installation, testing and Commissioning of Radio Remote Control (RRC) System for EOT Crane. (245.37 KB) VECC/MEG/ESD/ES/2025-26/B-56/2050 Dated: 28/11/2025 01-12-2025 05-12-2025

22 Fabrication and supply of two nos. of Custom 3U rack with axial Fan as per drawing for ECR-3 Ion source at VECC, kolkata-64 (3.01 MB) VECC/DAE/ECRISFG/CUSTOM 3U RACK/2025-26/2337 Dated 27/11/2025 03-12-2025 08-12-2025

23 Shifting of EPBAX system and license for SIP trunk in EPBAX system installed at VECC Rajarhat, Make: Matrix, Model: Eternity LENX27SDC (605.48 KB) VECC/CIG/RKP/Minor Works/2025/03 Date: 21/11/2025 24-11-2025 01-12-2025

24 Non-comprehensive maintenance contract for Electronic Private Automatic Branch Exchange (EPABX) (Make: Tadiran; Model: Coral -5000 EPABX) working round the clock in VECC Kolkata-700064 (603.66 KB) VECC/CIG/RKP/Minor Works/2025/02 Date: 21/11/2025 24-11-2025 01-12-2025

25 Fabrication and laying of stainless steel make piping for transportation of compressed air for MC-18 project at VECC,Kolkata (168.1 KB) VECC/MEG/LCW/NIT/2300 Date: 21-11-2025 24-11-2025 10-12-2025

26 Gas Cylinder refill(70 % Argon with 99.999% purity+30% CO2 with 99.97% purity) (146.86 KB) VECC/EHEPAG/NKB/2025/01 Date: 12.11.2025 12-11-2025 20-12-2025

27 Eradication of Rat, Lizard and Bees/Wasps Menace including post construction anti termite treatment in Offices and Laboratories etc. in three campuses (i.e at Bidhannagar, MCF Chakgaria & Rajarhat Campus) of VECC, Kolkata (3.06 MB) VECC/MEG/ESD/CMS/ NIT/T-131/B-53/2189 Date:04.11.2025 07-11-2025 21-11-2025

28 Supply and installation of recessed mounting type LED light fittings in VECC (32.16 KB) VECC/MEG/ESD/ES/2025-26/B-54/2208 Date:07/11/2025 10-11-2025 18-11-2025

29 Renovation of Coil Winding Lab area room at 1/AF, Bidhannagar, Kolkata- 700064. (878.86 KB) VECC/MEG/ESD/CES/PW/2025-26/T-197/B-52/2164 Date:31-10-2025 03-11-2025 12-11-2025

30 Revamping of CCTV Surveillance System at MCF, New Garia. (1.15 MB) VECC/MCF/CCTV/NIT/2025/2133, Date- 28/10/2025 29-10-2025 07-11-2025

31 Repairing of DG set silencers in VECC, Bidhannagar campus and modification of doors of transformer yard at MCF Chakgaria”. (216.31 KB) VECC/MEG/ESD/ES/2025-26/B-51/2037 Date:13/10/2025 14-10-2025 23-10-2025

32 Repairing of Power Transformer in VECC, Bidhan Nagar. (1.06 MB) VECC/MEG/ESD/ES/2025-26/B- 49/2015 Date: 09/10/2025 10-10-2025 21-10-2025

33 VECC Thorough Cleaning of drinking and Soft Water UG Tanks 2025 (862.4 KB) VECC/ ESD/ AC/Petty/B- 48/1971;Date: 06/10/2025 06-10-2025 14-10-2025

34 Supply, installation, testing and commissioning of electrical system for cyclotron project, VECC (1.61 MB) VECC/MEG/ES/NIT/25-26/B-47/1948 DT: 25/09/2025 30-09-2025 14-10-2025

35 Fabrication and laying of stainless steel water pipe for transportation of LCW for MC-18 project at VECC, Kolkata (168.71 KB) VECC/MEG/LCW/NIT/1917 Date: 22-09-2025 23-09-2025 07-10-2025

36 Installation of ACs at different areas of VECC (987.76 KB) VECC/ ESD/ AC/Petty/B- 46/1910;Date: 18/09/2025 18-09-2025 13-10-2025
37 Minor repairing work at ECR Lab including other miscellaneous civil works at SCC building portico at 1/AF, VECC, Bidhannagar, Kolkata- 700 064. (725.38 KB) VECC/MEG/ESD/CES/PW/2025-26/T-196/B-45/1882 Dated: 16.09.2025 16-09-2025 25-09-2025

38 Contract for maintenance of different P.H. installations at Bidhannagar campus of VECC, 1/AF, Bidhannagar, Kolkata – 64. (3.25 MB) VECC/MEG/ESD/CMS/NIT/T- 1917/B-43/1826 Date 08.09.2025 11-09-2025 24-09-2025

39 Revamping of CCTV Surveillance System at MCF, New Garia. (566.05 KB) VECC/MCF/CCTV/NIT/2025/830 Date: 08/09/2025 08-09-2025 16-09-2025
40 Provision for installation of Ductile Iron underground pipe line from Municipal water supply line to underground water tank at Anushakti Abasan, 1/AF, Bidhannagar, Kolkata-64. (3.07 MB) VECC/MEG/ESD/CMS/NIT/T-130/B-41/1795 Date: 02.09.2025 04-09-2025 17-09-2025

41 Providing and stacking of various winter seedlings at all campuses of VECC, 1/AF, Bidhan Nagar, Kolkata-700064 (812.39 KB) VECC/MEG/ESD/P&G/PW/195/2025-26/1796 Date: 02.09.2025 02-09-2025 11-09-2025

42 Cleaning of grass, plants, dry leaves & unwanted materials etc. at roof including removal & stacking at designated places inside VECC office campus at Bidhannagar campus of VECC, Kolkata- 700064. (881.86 KB) VECC/MEG/ESD/CES/PW/2025-26/T-194/B-40/1777 Date: 01-09-2025 02-09-2025 11-09-2025

43 On-site repairing and replacement of new gearbox assembly compatible with existing 300 mm N.B. flange end gear operated ball valve at LCW Section, VECC. (519.21 KB) VECC/MEG/LCW/NIT/1779 Dated: 01/09/2025 02-09-2025 15-09-2025

44 Sampling and analysis of stack gas of Diesel Generator sets installed in different campuses of VECC (181.76 KB) VECC/MEG/ESD/ES/2025-26/B-39/1773, date 29/08/2025 01-09-2025 10-09-2025

45 Development of Vertical Garden at Bidhannagar campus of VECC, 1/AF, Bidhannagar, Kolkata-700 064 (3.76 MB) VECC/MEG/ESD/P&G/NIT/T-1916/B-36/1691 Dated: 18.08.2025 20-08-2025 02-09-2025

46 Renovation of Conference Room inside PSI building at 1/AF, Bidhannagar, Kolkata-700 064. (880.66 KB) VECC/MEG/ESD/CES/PW/2025-26/T-193/B-35/1579 Date:29-07-2025 30-07-2025 07-08-2025

47 On-site replacement of Spares & repairing of refrigerant air dryer having model no-FDI 220A at LCW Section, VECC. (517.38 KB) VECC/MEG/LCW/NIT/1575 Dated: 28/07/2025 29-07-2025 11-08-2025

48 Minor repairing work at General Canteen, Low Bay North at RTC building and other areas inside VECC, 1/AF, Bidhnanagar, Kolkata- 700 064.” (196.31 KB) VECC/MEG/ESD/CES/PW/2025-26/T-192/B-34/1546 Dated: 22.07.2025 22-07-2025 30-07-2025

49 Professional Service for Fire Safety Certification. (628.78 KB) VECC/MEG/NIT/B-33/1490, Date: 16.07.2025 16-07-2025 22-07-2025

50 Construction of single storey pre fab house at MCF Chakgaria campus and set up of a temporary control room for MC18 project at Bidhannagar campus of VECC, Kolkata. (5.6 MB) VECC/MEG/ESD/CES/NIT/T-1915/B-32/1433 Dated 10/07/2025 15-07-2025 30-07-2025

51 Insulation of Evaporator of (02 × 350 TR) Kirloskar Chiller Plant. (987.54 KB) VECC/ESD/AC/Petty/B-31/1426, dated 09/07/2025 10-07-2025 23-07-2025

52 Supplying, installation and commissioning of various spare parts of few machines including servicing etc. for P&G section at all campuses of VECC, 1/AF, Bidhannagar, Kolkata-64 VECC/MEG/ESD/P&G/PW/B-30/2025-26/995 dated 09.07.2025 09-07-2025 17-07-2025

53 Construction of a temporary enclosure to facilitate assembling of MC18 high-current proton cyclotron magnet including providing enclosure for 600 kVA UPS for RIB at Bidhannagar campus of VECC, Kolkata. (2.27 MB) VECC/MEG/ESD/CES/NIT/T-1914/1384 Dated 04/07/2025 08-07-2025 23-07-2025

54 Removing, dismantling, and shifting of the Helium Impure Gas Cylinders form existing three Quads along with Helium gas pipe line and MS Structure and helping for loading on the truck (723.31 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-28/1224, Dated: 16/06/2025. 19-06-2025 25-06-2025

55 Dismantling at SCC loading / unloading bay and Re- assembling of Cold Box Holding structure at RIB Annex building, VECC, 1/AF, Bidhan Nagar, Kolkata – 700064. (700.33 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-29/1223 Dated: 16 /06/2025 19-06-2025 25-06-2025

56 Cutting -pruning & cleaning of coconut and other trees at Bidhannagar & MCF, Chakgaria campus of VECC, 1/AF, Bidhannagar, Kolkata-700064 (851.36 KB) VECC/MEG/ESD/P&G/PW/191/2025-26/ 1196 Date: 11.06.2025 11-06-2025 19-06-2025

57 Repairing of spring charging mechanism of a 36kV, 1250 Am Schneider make VCB inside VECC, Kolkata. (439.51 KB) VECC/MEG/ESD/ES/2025-26/B-26/1186 Date:10/06/2025 11-06-2025 18-06-2025

58 External repair & painting of few blocks constructed in different phases at Anushakti Abasan 1/AF, Bidhannagar, Kolkata-64. (3.42 MB) VECC/MEG/ESD/CMS/NIT/T-1913/ B-23/1140 Date 02.06.2025 06-06-2025 21-06-2025

59 Shifting of Cold Box and it’s Structure from SCC Loading / Unloading bay to RIB Annex Building, VECC, 1/AF, Bidhan Nagar, Kolkata – 700064. (474.15 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/ B-24/1156 Dated: 04/06/2025 04-06-2025 11-06-2025

60 Dismantling, and shifting of water tank, MCC panel, and pumps from Cryogenic Plant Building to Scrap yard VECC (607.71 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/1102 Dated: 26/05/2025 26-05-2025 02-06-2025

61 Cleaning of structural glazing of Silver Jubilee Guest House at Bidhannagar campus of VECC, Kolkata-700064. (863.29 KB) VECC/MEG/ESD/CES/PW/2025-26/189/1026 Date: 19-05-2025 19-05-2025 26-05-2025

62 Supply, fabrication and Installation of Coalesce Oil Filter in the Air Line (613.83 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-1004 Dated: 15/05/2025 16-05-2025 22-05-2025

63 Supply, fabrication and Installation of Coalesce Oil Filter in the Air Line (616.27 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-22/881 Dated: 01/05/2025 02-05-2025 13-05-2025

64 Supplying & stacking of garden soil at various campuses of VECC, 1/AF, Bidhannagar, Kolkata-64 (807.58 KB) VECC/MEG/ESD/P&G/PW/2025-26/188/878 Date: 01.05.2025 01-05-2025 09-05-2025

65 Supply, fabrication and Installation of coalescer Oil Filter in the Air Line (568.55 KB) VECC/MEG/CPIS/NIT/PETTY WORKS/B-19/806 Dated: 15/04/2025 15-04-2025 24-04-2025

66 Shifting of 2 Nos. of Helium Gas Quads (Each 4.5 Tones) and all the other materials stored for Helium Plant’s use (Approx. total weight 8 Tones) from Helium Gas Manifold yard to is outside adjacent open space towards Buffer Tank and reinstal (700.27 KB) VECC/MEG/CPIS/NIT/PETTY WORKS/ B-18/805 Dated: 15/04/2025 15-04-2025 24-04-2025

67 X-ray Radiography testing for 25 weld joints of the new helium cold box (708.75 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-17/755 Dated: 07/04/2025 08-04-2025 16-04-2025

68 Supply and installation of NO Drone Zone sign Board at VECC, Kolkata. (999.57 KB) VECC/C&IG/NDZ/NIT/2025/746, Dated- 07/04/2025 08-04-2025 22-04-2025

69 Shifting of Electrical Panels and electrical cables inside VECC, Kolkata. (575.42 KB) VECC/MEG/ESD/ES/2025-26/735 Date:03/04/2025 04-04-2025 11-04-2025

70 Inspection, testing & certification of Safety Relief valves fitted with pressure vessels as per Rule 18 of SMPV (U) Rules, 2016 at Cryogenic plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064 (659.55 KB) VECC/MEG/CPIS/NIT/PETTY WORKS/ B-14/724 Dated: 02/04/2025 03-04-2025 16-04-2025

71 Supply and fabrication of M.S & S.S structure for hanging the gas bag at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064. (610.41 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/ 702 Dated: 27/03/2025 28-03-2025 07-04-2025

72 Cold Box shifting structure at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064 (428.34 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/ 703 Dated: 27/03/2025 28-03-2025 07-04-2025

73 Horticulture Service - Maintenance Based Model - Service with known quantity of Consumables; General Maintenance of Garden/Lawn/Field/Nursery/Park (92.64 KB) GEM/2025/B/6029034 24-03-2025 03-04-2025

74 Repairing of 12 TR Ductable Air-Conditioner. (650.29 KB) VECC/ ESD/ AC/Petty/B-11/612;Date: 18/03/2025 18-03-2025 25-03-2025

75 Roof treatment of Pre-Engineered Building (PEB) at Rajarhat campus of VECC, Kolkata-156. (764.73 KB) VECC/MEG/ESD/CES/PW/2024-25/187/ B-08/ 554 Date: 12.03.2025 12-03-2025 21-03-2025

76 On-site repair & renovation of RTC cooling tower Store Room truss support structure by using Pipe and angles at LCW Section, VECC. (523.75 KB) VECC/MEG/LCW/NIT/555 Dated: 12/03/2025 13-03-2025 25-03-2025

77 Electrification of Rooms inside DG building, VECC, Bidhan nagar, Kolkata. (188.69 KB) VECC/MEG/ESD/ES/2024-25/472 Dated: 24.02.2025 25-02-2025 04-03-2025

78 Operation and Maintenance of Water Supply Systems- Complete System (98.26 KB) GEM/2025/B/5832197 Date: 24-02-2025 24-02-2025 12-03-2025

79 Supply and fabrication of MS structure to change the ID fan at Cryogenic Plant Building (383.3 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-06/468 Dated: 24/02/2025 24-02-2025 28-02-2025

80 Fabrication and Installation of Lead (Pb) sheet for X-ray shielding (103.73 KB) VECC/EHEPAG/CG/2025/02 Date: 13.02.2025 13-02-2025 20-02-2025

81 Supply, installation, testing, commissioning of 4 nos. of 4 MP, PoE based, Night vision capable, IP67 and ONVIF compatible CCTV Camera ,8 port PoE switch, 2TB surveillance Hard disk along with NVR 8 Channel and other accessories required for K-500 Superc (2.29 MB) VECC/APG/CCS/CAMERA/225 dated 27/01/2025 03-02-2025 05-02-2025

82 Repairing of Boom Barrier at main gate outside & Replacement of defective spare parts to make the boom barrier functional at VECC, Kolkata. (211.07 KB) VECC/C&IG/ TFSSD NIT/2024-25/B- 01/198 तारीख /Date: 23/01/2025 25-01-2025 31-01-2025

83 Rerouting & revamp of AHU drain pipe line at RTC corridor (ground floor) inside VECC office complex, 1/AF, Bidhannagar, Kolkata – 64. (3.59 MB) VECC/MEG/ESD/CES/NIT/T- 1912/B-02/95 Date 10.01.2025 16-01-2025 29-01-2025

84 Servicing of Canon Digital Multifunctional Printer model- iR2530 bearing Sl. No.RNS01147. (807.3 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/139 Dated: 14/01/2025 16-01-2025 22-01-2025

85 CAMC for three (03) numbers of Deep Tube wells for two (02) years at VECC, Bidhan Nagar. (754.62 KB) VECC/MEG/ESD/AC/NIT/B-03/98 ;Dated- 10/01/2025 14-01-2025 27-01-2025

86 Electrification of Room No-60, VECC , Bidhan Nagar, Kolkata. (212.75 KB) VECC/MEG/ESD/ES/2024-25/B-04/112 Dated: 13.01.2025 13-01-2025 21-01-2025

87 Gas Cylinder refill (157.89 KB) VECC/EHEPAG/CG/2025/01 Date: 07.01.2025 07-01-2025 21-01-2025

88 Urgent repairing of underground water supply line of RIB Anex building and water supply line of TMU section, inside VECC office complex, 1/AF, Bidhannagar, Kolkata-64. (886.39 KB) VECC/MEG/ESD/CM/PW/2024-25/T-186/B-1/05 Date: 01.01.2025 02-01-2025 10-01-2025

89 Repair & renovation of cooling tower Store Room rain shed by using PPGL Sheets at LCW Section, VECC (513.57 KB) VECC/MEG/LCW/NIT/39 Dated: 06/01/2025 07-01-2025 21-01-2025

90 Supply, fabrication and fixing of sign board at VECC , Bidhan Nagar, Kolkata. (177.43 KB) VECC/MEG/ESD/ES/2024-25/B-65/33 Dated: 06.01.2025 06-01-2025 13-01-2025

91 External renovation of Main Building including face lifting of Director’s Office & others area at 1/AF, Bidhannagar, Kolkata-700 064 (3.35 MB) VECC/MEG/ESD/CES/NIT/T-1911/B-64/2053 Dated: 24.12.2024 27-12-2024 13-01-2025

92 Operation and Maintenance of Electrical Systems/Electrical Installations - Complete System. (92.85 KB) GEM/2024/B/5747936 DT: 24.12.2024 24-12-2024 08-01-2025

93 Lifting and Placing of SS304 storage tank (600 kg) of ultra pure water system in RIB Annex at VEC Centre, Salt Lake Kolkata. (77.04 KB) VECC/RIBFG/2024/Minor Work/Lifting- SS304 Tank/ NIT/2042 Dated 23.12.2024 26-12-2024 06-01-2025

94 Dismantling and reinstallation of Sub-station exhaust fan and repairing of AHU fan. (649.7 KB) VECC/ ESD/ AC/Petty/ B-63/2005 dated: 20/12/2024 20-12-2024 03-01-2025

95 VECC/MEG/LCW/NIT/1950 Date: 18-12-2024 (661.74 KB) Fabrication of stainless steel S shape pipe bend along with hydrotesting and insulation for MC-18 project at VECC, Kolkata. 19-12-2024 03-01-2025

96 On-site repair & renovation of FRP Cooling Tower drain & overflow pipelines including installation of isolation valves at LCW Section, VECC. (544.86 KB) VECC/MEG/LCW/NIT/1942 Dated: 17/12/2024 18-12-2024 02-01-2025

97 “Illumination of peripheral and internal roads including cable laying and termination at VECC, Bidhan Nagar, Kolkata.” (3.17 MB) VECC/MEG/ESD/ES/2024-25/B-62/1936 Date: 13.12.2024 17-12-2024 01-01-2025

98 Supply & installation of aluminium structure for HDPE block wall setting up/ hold up in side solid target cave of Medical Cyclotron Facility Chakgaria Kolkata 700094. (413.83 KB) VECC/ATG/MCFS/NIT/B-61/1914 16-12-2024 23-12-2024

99 Architectural Consultancy for renovation of Toilets of Various buildings at VECC Bidhannagar Campus and CHSS Dispensary inside VECC campus and VECC Anushakti Abasan, Bidhannagar. (87.9 KB) Bid No.: GEM/2024/B/5532997 Dated: 28.11.2024 28-11-2024 28-12-2024

100 "Waterproofing work at south side low bay of RTC building at VECC, 1/AF, Bidhannagar, Kolkata-700 064." (763.55 KB) VECC/MEG/ESD/CES/PW/T-180/2024-25/B-60/1868 Dated: 02.12.2024 02-12-2024 10-12-2024

101 "Supplying, installation and commissioning of various spare parts of garden wheel barrows including welding-paintings etc.for P&G section at all campuses of VECC, 1/AF, Bidhannagar, Kolkata-64." (497.05 KB) VECC/MEG/ESD/P&G/PW/T-185/2024-25/B-59/1863 Dated: 02.12.2024 02-12-2024 10-12-2024

102 SUPPLY, INSTALLATION, TESTING & Commissioning (SITC) OF TWO (02) NOS. OF DISPLAY BOARDS BEARING NAME & ADDRESS OF EASTERN REGIONAL REGULATORY CENTRE (ERRC), ATOMIC ENERGY REGULATORY BOARD (AERB) AT AMD-AERB BHAVAN, VECC’s RAJARHAT CAMPUS IIIB/4, NEWTOWN, (373.37 KB) AERB/ERRC/SERVICE/T-SITC-DB/2024/ November 27, 2024 28-11-2024 16-12-2024

103 On-site repair and overhauling of single stage horizontal back pull-out design centrifugal pump at RTC LCW plant, VECC, Kolkata. (247.2 KB) VECC/MEG/LCW/NIT/B-56/1840 Dated: 26-11-2024 27-11-2024 04-12-2024

104 Preventive maintenance of water supply pumps & motors at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64 (620.2 KB) VECC/MEG/ESD/CM/PW/2024-25/T-184/B-55/1839 Date: 26.11.2024 27-11-2024 05-12-2024

105 Urgent P.H maintenance work as and when required at Anushakti Abasan and inside VECC office complex, 1/AF, Bidhannagar, Kolkata – 64. (3.16 MB) VECC/MEG/ESD/CMS/NIT/T-129/B-54/1806 Date:18.11.2024 21-11-2024 04-12-2024

106 Modification in power to Main Magnet Power supplies in SCC. (689.75 KB) VECC/MEG/ES/NIT/24-25/B-53/1782 DT: 08.11.2024 12-11-2024 25-11-2024

107 Providing granite flooring on the steps of Rangamanch and Aradhana etc. at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64. (615.48 KB) VECC/MEG/ESD/CM/PW/2024-25/T-183/1728 Date:30.10.2024 04-11-2024 12-11-2024

108 Renovation of workspace area with aluminum partition wall at the DG building, VECC.. (562.81 KB) VECC/MEG/ES/NIT/24-25/B-49/716 DT: 28.10.2024 29-10-2024 18-11-2024

109 Shielding of 1.7 Tesla electromagnet. (295.95 KB) VECC/PG/ENPD/CT&NSS/2024/MinorWork/B-52/1742, Dated 05/11/2024 05-11-2024 18-11-2024

110 Roof treatment work of RIB Lab at VECC, 1/AF, Bidhannagar, Kolkata-700 064. (1.2 MB) VECC/MEG/ESD/CES/PW/2024-25/181/B-51/1721 Date: 29.10.2024 30-10-2024 08-11-2024

111 Replacement of gear oil and greasing of EOT Cranes. (542.34 KB) 1731 dated 01.11.2024 04-11-2024 18-11-2024

112 Supply, fabrication and erection of pump room roofing shade on rooftop of RIB annex building at VECC, Kolkata. (54.05 KB) VECC/RIBFG/2024/Minor Work/Shade-Ultrapure Water System/NIT/1718 Dated 28.10.2024 29-10-2024 08-11-2024

113 Urgent repair of existing storm water pipeline and adjacent chamber in front of Ardra building at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64 (816.38 KB) VECC/MEG/ESD/CM/PW/2024-25/182/ 1649 Date: 17.10.2024 21-10-2024 29-10-2024

114 Dismantling and re-installation of 4 TR industrial AC at main building ground floor (649.89 KB) VECC/ ESD/ AC/Petty/B-48/1658 ; Dated: 18/10/2024 18-10-2024 30-10-2024

115 Fixing/pasting dust resistant curtain on 10 power supply racks consisting of High Precision Quadrupole magnet power supplies at HR Cave 1 (519.42 KB) VECC/RIBFG/ 2024/ Minor Work/Pasting dust resistant curtain/NIT/582 Date: 27/09/2024 30-09-2024 07-10-2024

116 Painting of cooling tower structural supports and pipe lines at LCW plant, VECC, Kolkata. (118.2 KB) VECC/MEG/LCW/NIT/1570 Date: 26-09-2024 27-09-2024 16-10-2024

117 FOCAL Interface board along with required components as listed in the annexure-1 (344.29 KB) GOI/DAE/VECC/EHEPAG/SM/09-2024/1 Date: 20/09/2024 20-09-2024 26-09-2024

118 Supplying and stacking of various winter seedlings & garden soil at various campuses of VECC, 1/AF, Bidhan Nagar, Kolkata-700064 (744.88 KB) VECC/MEG/ESD/P&G/PW/2024-25/179/B-44/1504 dated 12.09.2024 13-09-2024 24-09-2024

119 Replacement of 4 inch Reverse Osmosis membrane from FRP pressure vessel for existing RO plant at Kolkata,VECC (136.73 KB) VECC/MEG/LCW/NIT/1441 Date: 02-09-2024 04-09-2024 18-09-2024

120 Annual contract for repairing, internal painting and hygienic coating etc. of Departmental flats etc. at Anushakti Abasan, Hudco and Purbasha Housing of VECC, Kolkata. (3.57 MB) VECC/MEG/ESD/CMS/NIT/ T-1910/1416 Date 29.08.2024 06-09-2024 20-09-2024

121 Dismantling and air end repairing the compressor (272.06 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/B-42/1404 Dated: 27/08/2024 28-08-2024 03-09-2024

122 Supply, Fabrication & Installation of ventilation duct for screw compressor in RIB LCW Plant at VECC Saltlake, Kolkata (56.68 KB) VECC/RIBFG/2024/Minor Work/Duct-Compressor/NIT/1400 Date: 26/08/2024 27-08-2024 06-09-2024

123 Onsite repair and replacement of shaft mechanical seal for high-pressure multistage centrifugal pump at LCW plant, MCF, Chak Garia, Kolkata. (495.09 KB) VECC/MEG/LCW/NIT/1313 Dated: 13-08-2024 16-08-2024 26-08-2024

124 Eradication of Rat, Lizard and Bees/Wasps Menace including post construction anti termite treatment in Offices and Laboratories etc. in three campuses (i.e at Bidhannagar, MCF Chakgaria & Rajarhat Campus) of VECC, Kolkata. (3.05 MB) VECC/MEG/ESD/CMS/ NIT/T-128/ 1276 Date: 05.08.2024 08-08-2024 21-08-2024

125 Renovation of various labs (e.g. INO Lab, Trap Lab etc.) near DG Building including others miscellaneous civil works at 1/AF, Bidhannagar, Kolkata-64 . (2.94 MB) VECC/MEG/ESD/CES/NIT/T-1909/B-40/1253 Dated: 31.07.2024 02-08-2024 19-08-2024

126 Dismantling and air end repairing the compressor (733.89 KB) VECC/MEG/CP&IS/NIT/PETTY WORKS/1222 Dated: 29/07/2024 30-07-2024 06-08-2024

127 Epoxy flooring & PU painting at SCC building including other miscellaneous civil works in different labs at Bidhannagar campus of VECC, Kolkata- 700064. (635.61 KB) VECC/MEG/ESD/CES/NIT/T-1908/1171 Dated 19/07/2024 23-07-2024 07-08-2024

128 Onsite replacement of exhausted super charged resins and re-filling with new supercharged resins for FRP mixed bed unit at MCF, LCW Section, VECC. (108.81 KB) VECC/MEG/LCW/NIT/1161 Dated: 19-07-2024 22-07-2024 01-08-2024

129 Annual contract for repairing, internal painting and hygienic coating etc. of Departmental flats etc. at Anushakti Abasan, Hudco and Purbasha Housing of VECC, Kolkata. (3.56 MB) VECC/MEG/ESD/CMS/NIT/ T-1907 / B-39/1112 Date 15.07.2024 19-07-2024 05-08-2024

130 On site repair & renovation of cooling tower Cold basin support structure & rain shed support structure at LCW Section, VECC (477.8 KB) VECC/MEG/LCW/NIT/1121 Dated: 16/07/2024 18-07-2024 29-07-2024

131 Replacement of damaged window glass panes in different departmental flats at Anushakti Abasan, Hudco, Purbasha including maintenance of aluminium door and window shutters in all three campuses of VECC (i.e. Bidhanagar, Rajarhat and MCF Chakgaria). (3.42 MB) VECC/MEG/ESD/CMS/NIT/T- 1906/ 1072 Date 09.07.2024 11-07-2024 24-07-2024

132 Providing Electrical power connection to different loads of Helium Laboratory at VECC, Bidhan Nagar, Kolkata. (2.63 MB) VECC/MEG/ES/NIT/2024-25/B-38/1049 Dated 04.07.2024 06-07-2024 20-07-2024

133 Annual contract for maintenance of different P.H. installations at Bidhannagar campus of VECC, 1/AF, Bidhannagar, Kolkata – 64 (2.71 MB) VECC/MEG/ESD/CMS/ NIT/T- 127/ B-37/1024 Date: 02.07.2024 05-07-2024 19-07-2024

134 Complete cleaning of Kitchen hood exhaust system (653.32 KB) VECC/ ESD/ AC/Petty/ B-36/961 dated: 26/06/2024 26-06-2024 09-07-2024

135 Cleaning of filters (Pre Filter) of AHU, FCU& Exhaust etc. (650.45 KB) VECC/ ESD/ AC/Petty/ B-35/922 dated: 20/06/2024 20-06-2024 03-07-2024

136 Supply, installation, testing & commissioning of in line Vertical Multistage Centrifugal Booster pump to enhance the line pressure for ECR Coils at LCW section, VECC. (153.35 KB) VECC/MEG/LCW/NIT/919 Dated: 20/06/2024 24-06-2024 08-07-2024

137 Fabrication and Supply of Support Structure for MC18 Injection Beamline (65.39 KB) VECC/MEG/ATDMS/NIT/T/B-34/890, Dated - 11/06/2024 18-06-2024 08-07-2024

138 Annual contract for maintenance of two numbers tube wells including submersible pumps at Anushakti Abasan, 1/AF, Bidhannagar, Kolkata – 64 (3.37 MB) VECC/MEG/ESD/CMS/ NIT/T-126 / B-33 / 875 Date: 06.06.2024 13-06-2024 26-06-2024

139 Renovation of water testing lab that include replacement of window blinds, table top glass, supply of lab accessories and painting at LCW Section, VECC, Kolkata. (625.9 KB) VECC/MEG/LCW/NIT/854 Dated: 04-06-2024 05-06-2024 13-06-2024

140 Supply of SS304L fittings, Welding and Radiography testing of external SS304L pipe for Helium Liquefier test set-up at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064. (614.91 KB) VECC/MEG/CP&IS/NIT/Petty Works/ 824 dated 29.05.2024 04-06-2024 13-06-2024

141 Modification of pipelines for coolant supply to turboexpanders of new liquefier developed inhouse at CPI Section at Cryogenic Plant Building, 1/AF, Bidhan Nagar, Kolkata – 700064 (618.02 KB) VECC/MEG/CP&IS/NIT/Petty Works/ 823 dated 29.05.2024 04-06-2024 13-06-2024

142 Miscellaneous services related to Medical Dispensary” at Medical Section, VECC and Anushakti Abasan Medical Dispensary, VECC, Kolkata. (2.51 MB) VECC/ATG/NIT/T-1905/829 Dated 30/05/24 31-05-2024 13-06-2024

143 Nitrogen Gas refilling for Medical Cyclotron Facility Chakgaria Kolkata 700094. (292.82 KB) VECC/ATG/MCFS/2024-25 /B-29/779 28-05-2024 05-06-2024

144 Fabrication of rain shed roofs using corrugated sheet above DG Sets at VECC. (590.75 KB) VECC/MEG/ES/NIT/24-25/B-27/771 DT: 22.05.2024 23-05-2024 04-06-2024

145 Assisting in operation and maintenance of various detectors such as charge particle, neutron and gamma, high vacuum systems, and instruments in laboratories of Cryogenic Trap Facility, XRD, FESEM, UTM, PPMS, TGA/DSC, UV-Vis spectrometer etc., at VECC (90.49 KB) GEM/2024/B/4969557 22-05-2024 03-06-2024

146 Repairing & overhauling of Automatic power factor correction (APFC) panels. (87.92 KB) GEM/2024/B/4867669 Dated: 13-05-2024 15-05-2024 27-05-2024

147 Shifting of hand portable shielding concrete blocks and other cleaning job (2.17 MB) VECC/NIT/T/MEG/ATD(M)S/2024/754, Dated - 15/05/2024 15-05-2024 16-05-2024

148 Onsite repair and overhauling of high pressure vertical multistage centrifugal pump at MCF, Chak Garia, Kolkata. (461.82 KB) VECC/MEG/LCW/NIT/737 Dated: 10-05-2024 13-05-2024 20-05-2024

149 Supplying, installation and commissioning of various spare parts of few machines including servicing etc. for P&G section at all campuses of VECC, 1/AF, Bidhannagar, Kolkata-64 (827.67 KB) VECC/MEG/ESD/P&G/PW/2024-25/178/ 691 Date: 06-05-2024 07-05-2024 15-05-2024

150 Fabrication and supply of LCW Hose connectors for RF Transmitters as per drawing at RIB LCW plant. (37.17 KB) VECC/RIBFG/2024/Minor Work/LCW-RFConn/NIT/664 Dated 01.05.2024 02-05-2024 13-05-2024

151 "Miscellaneous services related to Medical Dispensary" at Medical Section, VECC and Anushakti Abasan Medical Dispensary, VECC, Kolkata. (704.81 KB) VECC/ATG/NIT/T-1903/643 DT: 26/04/2024 30-04-2024 13-05-2024

152 Repairing of Canteen Equipment at MCF, Chakgaria (540.3 KB) VECC/MEG/ES/NIT/2023-24/B-25/639 Date: 26.04.2024 29-04-2024 07-05-2024

153 Development of Vertical Garden including all allied civil work etc. at Bidhannagar campus of VECC, 1/AF, Kolkata-700 064 (3.71 MB) VECC/MEG/ESD/P&G/NIT/T-1902/621 Dated: 23.04.2024 25-04-2024 08-05-2024

154 Construction of rain shed over emergency stair adjacent to PEB including installation of PVC water tank at Rajarhat campus of VECC, Kolkata- 700 156 (3.09 MB) VECC/MEG/ESD/CES/NIT/T-1900/593 Dated: 16.04.2024 18-04-2024 06-05-2024

155 Fabrication work for closing of open floor cut outs, repairing of door locks of electrical distribution box & Ventilation hole cut out of rolling shutter at VECC Bidhan Nagar, Kolkata-700064. (878.66 KB) VECC/MEG/ES/24-25/B-23/589 Date: 16.04.2024 16-04-2024 24-04-2024

156 Fabrication of Target Seal Assembly (2.32 MB) VECC/NIT/T/MEG/ATD(M)S/2024/592, Dated - 16/04/2024 17-04-2024 01-05-2024

157 Onsite replacement of 4 inch RO membrane from FRP pressure vessel for existing RO plant at Kolkata,VECC (79.7 KB) VECC/MEG/LCW/NIT/580 Date: 12-04-2024 15-04-2024 24-04-2024

158 Epoxy flooring & PU painting at SCC building including other miscellaneous civil works in different labs at Bidhannagar campus of VECC, Kolkata- 700064. (626.78 KB) VECC/MEG/ESD/CES/NIT/T-1901/561 Dated 09/04/2024 11-04-2024 27-04-2024

159 FABRICATION, SUPPLY AND INSTALLATION OF PIPELINES TO CONNECT CHILLER AND CRYOCOOLER COMPRESSOR AT VECC, KOLKATA. (3.71 MB) VECC/ATG/NIT/T-/545 08-04-2024 22-04-2024

160 Re-installation of Split ACs at different campuses of VECC (1013.14 KB) VECC/ESD/AC/Petty/B-21/551 ; Dated: 05/04/2024 08-04-2024 17-04-2024

161 Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System (90.27 KB) GEM/2024/B/4833017 03-04-2024 17-04-2024

162 Assisting in various office woks at CRPU and CRSU, VECC, Kolkata using computer, xeroxing, maintenance and distribution of various office documents. (92.21 KB) GEM/2024/B/4823039 Date 01-04-2024 01-04-2024 11-04-2024

163 Assisting in the round-the-clock shift duty for operation and maintenance of the power supplies along with the fabrication works for the in-house development of the power supplies at VECC, Kolkata – 700064. (95.76 KB) GEM/2024/B/4704142 Date: 01-04-2024. 01-04-2024 11-04-2024

164 Assisting in the maintenance of Fire Detection System (FDS) and also assisting in the maintenance of Electronics Equipment related to Security and Surveillance systems at VECC and all other campuses of VECC including Anushakti Abasan, Kolkata – 700064. (95.49 KB) GEM/2024/B/4806114 Date: 01-04-2024 01-04-2024 11-04-2024

165 Testing of transformer oil (84.48 KB) GEM/2024/B/4606139 Date: 20.03.2024 20-03-2024 02-04-2024

166 Onsite repair and service of Delair make refrigerant air dryer at VECC, Salt Lake, Kolkata (526.8 KB) VECC/MEG/LCW/NIT/439 Dated: 14-03-2024 18-03-2024 26-03-2024

167 Supplying & stacking of various gardening items at different campuses of VECC (735.62 KB) VECC/MEG/ESD/P&G/PW/2023-24/177/B-19/417 Date: 08.03.2024 11-03-2024 19-03-2024

168 Shifting of materials at VECC, 1/AF, Bidhan Nagar Kolkata-64.” (717.6 KB) VECC/MEG/ES/NIT/2023-24/B-18/411 Date: 07.03.2024 08-03-2024 18-03-2024

169 Replacement of LED Landscape Light fittings. (716.66 KB) VECC/MEG/ES/NIT/2023-24/B-17/410 Date: 07.03.2024 08-03-2024 18-03-2024

170 Assisting in operation and maintenance of various detectors such as charge particle, neutron and gamma, high vacuum systems, and instruments in laboratories of Cryogenic Trap Facility, XRD, FESEM, UTM, PPMS, TGA/DSC, UV-Vis spectrometer etc., at VECC (89.6 KB) GEM ID: GEM/2024/B/4621913 07-03-2024 22-03-2024

171 Maintenance of Parks & Garden at Medical cyclotron facility, VECC, Budherhat Road,P.O – Panchasayar, Kolkata 700094 (89.46 KB) GEM ID:GEM/2024/B/4525732 29-02-2024 14-03-2024

172 Transformer oil filtration at VECC, Rajarhat campus. (521.63 KB) VECC/MEG/ES/23-24/B-11/340 DT: 26.02.2024 27-02-2024 11-03-2024

173 Maintenance of Parks & Garden at Bidhannagar including Anushakti Abasan & Rajarhat campus of VECC at 1/AF, Bidhannagar, Kol- 64. (89.55 KB) GEM/2024/B/4423799 Dated: 28.02.2024 28-02-2024 13-03-2024

174 Providing & fixing of bulging floor tiles at library including other miscellaneous civil works at Bidhannagar campus of VECC, Kolkata- 700064. (126.02 KB) VECC/MEG/ESD/CES/PW/2023-24/176/B-12/359 Date: 28.02.2024 28-02-2024 07-03-2024

175 Providing & fixing of Aluminium windows at Silicon Detector Lab of Main building at Bidhannagar campus of VECC, Kolkata- 700064. (129.58 KB) VECC/MEG/ESD/CES/PW/2023-24/175/B-09/335 Date: 22.02.2024 23-02-2024 04-03-2024

176 Shifting of FSD571SFC air-end and motor from their base inside the helium compressor module, and reinstalling them following repairs & maintenance (632.9 KB) VECC/MEG/CP&IS/2024/SP/B-07/315 Dated: 20/02/2024 21-02-2024 29-02-2024

177 Transformer oil filtration at VECC, Rajarhat campus. (239.04 KB) VECC/MEG/ES/NIT/2023-24/B-08/317 DT: 20.02.2024 22-02-2024 29-02-2024

178 Dismantling and reinstallation of air end for repairing the compressor #3 installed at Cryogenic Plant Building (564.1 KB) VECC/MEG/CP&IS/2024/SP/B-06/306 Dated: 19/02/2024 20-02-2024 29-02-2024

179 Rolling shutter modification and overhauling at VECC, Kolkata. (237.3 KB) VECC/MEG/ES/NIT/2023-24/B-05/205 DT: 05.02.2024 05-02-2024 13-02-2024

180 Maintenance of Canon Digital Multifunctional Printer Model IR2530 bearing Sl. No. RNS01147 at Cryogenic Plant Building, VECC (223.98 KB) VECC/MEG/CP&IS/2024/SP/B-04/184 Dated: 31/01/2024 02-02-2024 08-02-2024

181 Accidental damage repair and painting of Scorpio (Vehicle No. WB 02 AA 3410) (112.78 KB) VECC/MEG/ TMU/ 3410/2024/176 Date: 30 January 2024 01-02-2024 07-02-2024

182 Machining & Supply of Ball Screw (943.94 KB) VECC/NIT/T/MEG/ATD(M)S/2024/167 dated: 29/01/2024 29-01-2024 12-02-2024

183 VECC-Through Cleaning of Micro/Fine Filters for HVAC (651.13 KB) VECC/ESD/AC/Petty/B-03/145 dated: 22/01/2024 22-01-2024 02-02-2024

184 Pruning-cleaning of coconut and other trees at Bidhannagar campus including Anushakti Abasan of VECC, Kolkata-700064 (162.65 KB) VECC/MEG/ESD/P&G/PW/2023-24/86 Date: 12.01.2024 12-01-2024 22-01-2024

185 Repairing of Sharp make Xerox machine model AR6020V at VECC Kolkata. (701.04 KB) VECC/MEG/MMS/NIT/35 dated 04.1.2024 05-01-2024 19-01-2024

186 Fabrication and supply of LCW Hose connectors for RFQ at RIB in VECC. (1.9 MB) VECC/RIBFG/2023/Minor Work/LCW-RFQ/NIT/17 Dated 02.01.2024 04-01-2024 15-01-2024

187 Preventive maintenance of water supply pumps & motors at Anushakti Abasan, VECC, 1/AF, Bidhan Nagar, Kolkata- 64 (616.71 KB) VECC/MEG/ESD/CM/PW/2023-24/173/ B-58/2016 Dated:20.12.2023 20-12-2023 27-12-2023

188 Dismantling & disposed of an old, damaged reciprocating compressor and construction of RCC make foundation base for installation of newly procured screw compressor at LCW Section, VECC. (528.21 KB) VECC/MEG/LCW/NIT/2072 Dated: 27-12-2023 28-12-2023 08-01-2024

189 Assisting in various office works at Accounts, Administration and Security Section, VECC using computer, Xeroxing, maintenance and distribution of various office documents (588.63 KB) VECC/ATG/NIT/T-1898/1917 Dated: 05/12/2023 06-12-2023 22-12-2023

190 Onsite service including cleaning & flashing of radiator for Kirloskar make air screw compressor at VECC, Kolkata. (524.39 KB) VECC/MEG/LCW/NIT/ 1894 Dated: 01-12-2023 05-12-2023 19-12-2023

191 Proper modification of ladder fitted with Watch Tower at Main Gate for safe ascending and descending purpose at Bidhannagar campus of VECC, Kolkata- 700 064. (381.85 KB) VECC/MEG/ESD/CES/PW/2023-24/172/B-50/1872 dated: 28.11.2023 28-11-2023 06-12-2023

192 Renovation of one (01) nos. ladies toilet inside CRSU including fixing of one (01) nos aluminium window at main building (room no. 301) and providing roofing shed at security kiosk at Bidhannagar campus of VECC, Kolkata- 700 064. (400.09 KB) VECC/MEG/ESD/CES/PW/2023-24/171/B-51/1598 dated: 21.11.2023 22-11-2023 01-12-2023

193 Supply and installation of filter cartridge and heating element for 500 LPH transformer oil fitter machine at VECC, Kolkata (240.38 KB) VECC/MEG/ES/NIT/2023-24/B-52/1858 DT: 22.11.2023 23-11-2023 01-12-2023

194 Laying of power cable, installation of Earthing pits and mounting of Panel Fans at VECC. (592.97 KB) VECC/MEG/ES/NIT/23-24/B-49/1814 DT: 13.11.2023 17-11-2023 30-11-2023

195 On site repair & renovation of SCC cooling tower Cold basin support structure & fan motor access ladder by using MS angle, MS Pipe & FRP sheets etc. at LCW Section, VECC. (461.58 KB) VECC/MEG/LCW/NIT/1759 Date: 06-11-2023 07-11-2023 20-11-2023

196 Fabrication and Supply of Outer shaft for Carriage Assembly (2.69 MB) VECC/NIT/ATDS(Mech)/1737, Dated - 01/11/2023 01-11-2023 20-11-2023

197 Onsite repair and gas charging of Atlas Copco make refrigerant air dryer for compressed air system at MCF, Chak Garia, Kolkata. (108.28 KB) VECC/MEG/LCW/NIT/1653 Dated: 11-10-2023 12-10-2023 25-10-2023
NEW
198 Onsite replacement of exhausted super charged resins and re-filling with new supercharged resins for FRP mixed bed unit at MCF, LCW Section,VECC. (682.69 KB) VECC/MEG/LCW/NIT/1592 Date: 03-10-2023 04-10-2023 13-10-2023

199 Miscellaneous electrical works at VECC, Bidhan Nagar, Kolkata (692.11 KB) VECC/MEG/ESD/ES/2023-24/B-43/1589 Date: 03.10.2023 03-10-2023 11-10-2023

200 Repairing of electrical panel doors at VECC, Bidhan Nagar, Kolkata. (579.43 KB) VECC/MEG/ESD/ES/2023-24/B-42/1583 Date:29.09.2023 27-09-2023 06-10-2023

201 Maintenance Contract (AMC) for the year 2023-24 for Wonderware SCADA. (1.57 MB) VECC/NIT/T/MEG/CIS/B-41/1551: Dated - 21/09/2023 25-09-2023 20-10-2023
202 Overhauling and onsite regeneration of MSRL mixed bed unit for RO plant at RTC LCW system, VECC, Kolkata (517.78 KB) VECC/MEG/LCW/NIT/1553 Dated: 22-09-2023 25-09-2023 05-10-2023

203 Supply and installation of MS Perforated Sheet and door hinge of 04 Nos. DG Sets at VECC campus, Bidhan Nagar, Kolkata-700064. (239.63 KB) VECC/MEG/ES/NIT/2023-24/B-40/1538 Dated: 18.09.2023 18-09-2023 22-09-2023

204 Onsite repair and overhauling of horizontal multistage centrifugal pump having capacity 12 m3/hr with 150 MWC head for material science LCW plant at MCF,VECC, Kolkata (528.9 KB) VECC/MEG/LCW/NIT/1506 Date: 14-09-2023 19-09-2023 29-09-2023

205 Supply, Cleaning, Fitting, Erection, Welding, and Radiography Test of the External Piping Works for Helium Liquefier Test Set-up #1 at Cryogenic Plant Building, VECC, 1/AF, Bidhan Nagar, Kolkata – 700064. (1.09 MB) VECC/NIT/MEG/CPIS/B-27/1475 Dated:08/09/2023 11-09-2023 22-09-2023

206 Comprehensive Annual Maintenance Contract (CAMC) for the RFID Card Printer for 2 years (Dual side printer with laminator) (Make: FARGO, Model No.: HDP 5000, Sl. No.: B4260381) of VECC, Kolkata - 700064. (842.8 KB) VECC/NIT/C&IG/TFSSD/RFID Printer/1460 Date: 05/09/2023 05-09-2023 14-09-2023
207 Miscellaneous shifting works inside VECC campus, Bidhan Nagar Kolkata. VECC/MEG/ESD/ES/PW/2023-24/B-38/1381 Date: 24.08.2023 24-08-2023 30-08-2023

208 Comprehensive Annual maintenance for Clean room of PMD Lab at VECC (1.23 MB) VECC/EHEPAG/NIT/B-30/1157 Dated: 13-07-2023 14-07-2023 30-08-2023

209 Supply & fixing of Aluminium windows at N.K. Ganguly Lecture Hall of Main building at Bidhannagar campus of VECC, Kolkata- 700064. (530.15 KB) VECC/MEG/ESD/CES/PW/2023-24/169/B-37/1366 Date: 21.08.2023 21-08-2023 29-08-2023

210 Supply & installation of lights at MCF, Chakgaria (971.84 KB) VECC/MEG/ES/NIT-23-24/B-36/1357 Date: 18.08.2023 21-08-2023 30-08-2023

211 Supply & laying of vitrified tiles flooring at room no. 406 of C&IG building at Bidhannagar campus of VECC, Kolkata- 700064. (533.75 KB) VECC/MEG/ESD/CES/PW/2023-24/170/B-35/1147 Date: 16.08.2023 16-08-2023 23-08-2023

212 Supplying and stacking of various types of Organic manures and Fertilizers at all campuses of VECC, 1/AF, Bidhan Nagar, Kolkata-700064 VECC/MEG/ESD/P&G/PW/2023-24/168/B-34/1332 Date: 14.08.2023 14-08-2023 23-08-2023

213 Onsite repair and overhauling of high pressure vertical multistage centrifugal pump-motor set for RO System of Water Treatment Plant at MCF, Chak Garia, Kolkata. (109.36 KB) VECC/MEG/LCW/NIT/1314 Date: 09-08-2023 10-08-2023 22-08-2023

214 Fabrication of Structure for rotating coil magnetic field measurement VECC/NIT/ATDS(Mech.)/1232, Dated - 27/07/2023 28-07-2023 07-08-2023

215 Supply, Cleaning, Fitting, Erection, Welding, and Radiography Test of the Internal Piping Works for Helium Liquefier Test Set-up #1 at Cryogenic Plant Building, VECC, 1/AF, Bidhan Nagar, Kolkata – 700064. (1.09 MB) VECC/NIT/MEG/CPIS/B-28/1240 Dated:28/07/2023 31-07-2023 25-08-2023